Plans and Goals: Difference between revisions

From VrlWiki
Jump to navigation Jump to search
No edit summary
Line 4: Line 4:
Meetings are on Mondays.  The authoritative list is in dhl's calendar.
Meetings are on Mondays.  The authoritative list is in dhl's calendar.


== Current Plans and Goals (Summer/Fall '13) ==
== Current Plans and Goals (Spring '13) ==


=== [[User:Connor Gramazio|Connor]] ===
=== [[User:Connor Gramazio|Connor]] ===
Goals
* Finish third and second to last classes
* Rethink my research comp direction
** Finish a more specific, testable study
** Pilot study
** Establish list of todos for biovis part of research comps
** Have runnable prototype by end of semester


=== [[User:Hua Guo|Hua]] ===
=== [[User:Hua Guo|Hua]] ===
Line 37: Line 30:
*** detailed plan for at least one paper that could be part of the thesis
*** detailed plan for at least one paper that could be part of the thesis


=== [[User:Steven Gomez|Steve]] (Spring '14) ===
=== [[User:Steven Gomez|Steve]] ===


* Teach CS 0931
* Teach CS 0931
Line 60: Line 53:
** Submit IRB renewal by '''Jan 13''' at the latest
** Submit IRB renewal by '''Jan 13''' at the latest
** Complete CHI 2014 Work-in-Progress Program Committee duties; all wrapped up with meta-reviews by '''Feb 4'''
** Complete CHI 2014 Work-in-Progress Program Committee duties; all wrapped up with meta-reviews by '''Feb 4'''


=== [[User:Ryan Cabeen|Ryan]] ===
=== [[User:Ryan Cabeen|Ryan]] ===


* Submit a thesis proposal
* Complete thesis proposal
* Be a good TA for CS137
* Work on papers
* Give good talks at MICCAI
** Submit a great MICCAI paper (end of Feb)
* Contribute to crowdsourcing paper
** Contribute to Fauxvea infovis submission (end of March)
* Keep up with St. Louis folks
* Continue work on neuroimaging collabs
* Define and start South Africa analysis
** Finalize analysis for South Africa analysis
* Keep up contact with Dan
** Run connectivity analysis with St Louis data
 
** Maintain relationship with folks at RIH
=== [[User:Connor Gramazio|Connor]] ===
* Complete work outlined in proposal for this term
Goals
** Aim 1 framework developed and submitted
* Submit VIS poster using 237 data
** Aim 2 code partially developed
* Run paper prototype study
** Aim 3 studies run and progress made on papers
* Implement client/server cancer analysis tool capable of serving dynamic views
* Carry MTurk experiment from perception class as far as deemed fit
* Help IVRG MTurk project wrap up
 
Important dates:
* June 13-25: San Francisco; working ~9-5 M-F with e-mail access
* June 27: Poster deadline
* July 13-August 5: Ghana (Volta Region, Accra, Cape Coast); limited to no e-mail access


=== [[User:David Laidlaw|David]] ===
=== [[User:David Laidlaw|David]] ===
* get Jadrian graduated
* Cave operational by end of summer
** at least front wall, with blending and Cave Painting
* excellent cs237
* prep for cool, new(ish?) cs16 for Spring
* December Expeditions in Computing submission
* volume rendering interaction in WristVis
* brain metrics papers out with Ryan
* longer-term funding matched with group


=== [[User:Anne Kenyon|Anne]] ===
=== [[User:Anne Kenyon|Anne]] ===
Goals
* Continue construction of the new Cave as parts arrive
* Complete 1-3 demos for the Cave (not from scratch - adapting code from other sources)
** some of: Tom Banchoff, Mandelbox Fractal, Music Visualizer
** Have running in the Cave by the end of the summer
* Work on one long-term Cave project of use to scientists
** understand the science behind the simulation or tool
** develop and maintain a good relationship with scientists to encourage further productive use of the Cave.
* Prepare for GREs, take in August.


=== [[User:Steven McGarty| Steven]] ===
=== [[User:Steven McGarty| Steven]] ===
Goals
* Maintain CMCOA pipeline
** Fix SIGUSR1 issue and asssociated radius registration issues
** Provide troubleshooting and fix bugs if they arise - including the recent problems with the linux upgrade
* Install levmar and use to replace NAG library calls within CMCOA pipeline
* Work at making CIT-side portion of pipeline more user-friendly so that it is accessible to people without linux and programming experience
* Assist with construction of Cave
<!-- please don't edit below this line -->


=== [[User:Wesley Miller|Wesley]] ===
=== [[User:Wesley Miller|Wesley]] ===
*Finish new CAVE construction
*Get ParaView working on both  the new CAVE and the old one
*Get CavePainting (and other VRG3D applications by extension) working on both  the new CAVE and the old one
*Speak with faculty interested in working with the CAVE and compile a list of interests
*Work with different VR frameworks and get them running in the CAVE


<!-- please don't edit below this line -->
<!-- please don't edit below this line -->


----
----

Revision as of 21:24, 17 January 2014

On this page the members of the VRL record and refine their goals for the current semester. This is a living document in which dhl will provide feedback. See the bottom of the page for links to past plans & goals documents.

Current Schedule

Meetings are on Mondays. The authoritative list is in dhl's calendar.

Current Plans and Goals (Spring '13)

Connor

Hua

  • BraiNet
    • Improve the prototype to qualify for a submission
    • Submit
    • Getting it out in the wild
      • Reconnect with neuroscientists here at Brown
      • Reach out to Allen Brain Institute and Neuroscience Information Framework
  • Network edge uncertainty visualization
    • Draft paper with everything except final analysis results (Jan. 24)
    • Finish running users (Feb. 7)
    • Submit to InfoVis (March 31)
  • Aptima
    • Submit to VIS (March 31)
  • Crowd-based visualization evaluation
    • Perform temporal analysis on the data (Jan. 31)
    • Submit to VIS (March 31)
  • Thesis proposal
    • Find committee members
    • Finish a draft that has
      • a realistic timeline from now until defense
      • detailed plan for at least one paper that could be part of the thesis

Steve

  • Teach CS 0931
    • TA camp starting Jan 16
    • Prepare and practice each lecture and activity
    • Maintain open communication and availability with TAs and students
    • Have fast turn-around on students' grades
  • Crowd Eyetracking project
    • Redraft paper without any additional content from CHI submission by Jan 10 and circulate
    • Revise as needed and possibly add more eyetracking users
    • Submit to InfoVis: abstract on March 21, full paper on March 31
  • Aptima project
    • Incorporate changes to experiment protocol from pilot study
    • Finish running users by Jan 31
    • Finish analysis by Feb 15
    • Draft paper by March 7
    • Submit to VAST: abstract on March 21, full paper on March 31
  • Misc
    • Submit IRB renewal by Jan 13 at the latest
    • Complete CHI 2014 Work-in-Progress Program Committee duties; all wrapped up with meta-reviews by Feb 4

Ryan

  • Complete thesis proposal
  • Work on papers
    • Submit a great MICCAI paper (end of Feb)
    • Contribute to Fauxvea infovis submission (end of March)
  • Continue work on neuroimaging collabs
    • Finalize analysis for South Africa analysis
    • Run connectivity analysis with St Louis data
    • Maintain relationship with folks at RIH
  • Complete work outlined in proposal for this term
    • Aim 1 framework developed and submitted
    • Aim 2 code partially developed
    • Aim 3 studies run and progress made on papers

David

Anne

Steven

Wesley


Past Plans and Goals