Plans and Goals/Summer-Fall 2013
Jump to navigation
Jump to search
Current Plans and Goals (Summer/Fall '13)
Connor
Goals
- Finish third and second to last classes
- Rethink my research comp direction
- Finish a more specific, testable study
- Pilot study
- Establish list of todos for biovis part of research comps
- Have runnable prototype by end of semester
Hua
- BraiNet
- Get Mark on board with resource paper drafting
- Incorporate connectivity data from Allen Brain Atlas
- Network edge uncertainty visualization
- Get lab pilot study done before mid-October
- Refine the study design and run more experiments / analysis to prepare for a VIS'14 paper
- Aptima
- Finish prototyping and perform evaluation
- Draft a viewpoint article on sptial-temporal network patterns.
- Crowd-based visualization evaluation
- Work with others to have a submission on temporal analysis of click data to reveal visualization patterns
Steve (Spring '14)
- Teach CS 0931
- TA camp starting Jan 16
- Prepare and practice each lecture and activity
- Maintain open communication and availability with TAs and students
- Have fast turn-around on students' grades
- Crowd Eyetracking project
- Redraft paper without any additional content from CHI submission by Jan 10 and circulate
- Revise as needed and possibly add more eyetracking users
- Submit to InfoVis: abstract on March 21, full paper on March 31
- Aptima project
- Incorporate changes to experiment protocol from pilot study
- Finish running users by Jan 31
- Finish analysis by Feb 15
- Draft paper by March 7
- Submit to VAST: abstract on March 21, full paper on March 31
- Misc
- Submit IRB renewal by Jan 13 at the latest
- Complete CHI 2014 Work-in-Progress Program Committee duties; all wrapped up with meta-reviews by Feb 4
Ryan
- Submit a thesis proposal
- Be a good TA for CS137
- Give good talks at MICCAI
- Contribute to crowdsourcing paper
- Keep up with St. Louis folks
- Define and start South Africa analysis
- Keep up contact with Dan
Connor
Goals
- Submit VIS poster using 237 data
- Run paper prototype study
- Implement client/server cancer analysis tool capable of serving dynamic views
- Carry MTurk experiment from perception class as far as deemed fit
- Help IVRG MTurk project wrap up
Important dates:
- June 13-25: San Francisco; working ~9-5 M-F with e-mail access
- June 27: Poster deadline
- July 13-August 5: Ghana (Volta Region, Accra, Cape Coast); limited to no e-mail access
David
- get Jadrian graduated
- Cave operational by end of summer
- at least front wall, with blending and Cave Painting
- excellent cs237
- prep for cool, new(ish?) cs16 for Spring
- December Expeditions in Computing submission
- volume rendering interaction in WristVis
- brain metrics papers out with Ryan
- longer-term funding matched with group
Anne
Goals
- Continue construction of the new Cave as parts arrive
- Complete 1-3 demos for the Cave (not from scratch - adapting code from other sources)
- some of: Tom Banchoff, Mandelbox Fractal, Music Visualizer
- Have running in the Cave by the end of the summer
- Work on one long-term Cave project of use to scientists
- understand the science behind the simulation or tool
- develop and maintain a good relationship with scientists to encourage further productive use of the Cave.
- Prepare for GREs, take in August.
Steven
Goals
- Maintain CMCOA pipeline
- Fix SIGUSR1 issue and asssociated radius registration issues
- Provide troubleshooting and fix bugs if they arise - including the recent problems with the linux upgrade
- Install levmar and use to replace NAG library calls within CMCOA pipeline
- Work at making CIT-side portion of pipeline more user-friendly so that it is accessible to people without linux and programming experience
- Assist with construction of Cave
Wesley
- Finish new CAVE construction
- Get ParaView working on both the new CAVE and the old one
- Get CavePainting (and other VRG3D applications by extension) working on both the new CAVE and the old one
- Speak with faculty interested in working with the CAVE and compile a list of interests
- Work with different VR frameworks and get them running in the CAVE