Plans and Goals/Summer-Fall 2010

From VrlWiki
Jump to navigation Jump to search

Summer and Fall 2010 Plans and Goals

Beth

  • Update web
    • refresh text for projects and themes, add/delete some (maybe "active" as a theme)
    • ensure pubs are all correctly attributed to projects/themes/people
    • identify other areas to improve



Brad

Projects

  • Support the ongoing VRL Group projects:
    • Jadrian's brain research.
    • Radu's Protein project:
Assist Radu to integrate a test and any recent code.
  • Support collaborative projects.
    • Wrist cartilage support for Eni and Michael.
    • Migrate Win's mri pipeline to run in CIT.
    • Andy Loomis and Andy Forsberg's Adviser program.
  • Contribute to the design and development of the new cave. Integrate changes to vrg3d. Simplify the configuration and provide a quick start path for student projects.
  • Set up public distribution of diffusion imaging data.


Infrastructure

  • Manage the migration to the new file system.
  • Continue to write Wiki entries as needed.
  • Continue setting up third party software for students to use. Current imported packages are: blitz, cg, g3d, qt, camino, dtk, afni, nifti, vivro, vrpn, glut, and sdl.
  • Extend the build system to make kits for public source and binary distributions.
  • Improve support for remote development.
  • Launch the Windows test system.
  • Continue extend the make files to support new features such as additional third party packages.
  • Upgrade migrated Linux code to work with gcc 4.3 in conjunction with the summer Debian upgrade.
  • Continue to integrate any new tests written by students into nightly test runs.
  • Finish integrating the new version of the Nag libraries.


Knowledge

  • Learn more about the cave; particularly vrg3d software development.
  • Meet (SciVis talk) with students to address any integration issues.



Çağatay

  1. Resolve crossings w/ Geman and Erik (submit the results to cvpr by 11/11)
  2. Count cycles w/ Mumford
  3. Submit the ToG paper and explore the follow up ideas w/ Gabriel
  4. Submit the optimization on mesh graphs (to where? )
  5. Finalize the revision of the 2d map paper
  6. Solidify the ideas on metric learning through interaction
  7. Minimize the ta'ship workload of c. topology class by preparing course material aeap.



Caroline

Explore cognitive modeling for assessing multiview visualization interfaces

  • Literature review: guidelines for multiview design, evaluations of multiview visualization, cognitive science perspective on problem solving with multiple perspectives etc.
  • Identify an application area (brain circuits, proteins, etc.)
  • Identify tasks for user study / modeling
  • Identify ways to define the similarity of models between two different visual representations
  • Build a model of multiview context-switching given a certain type of task, to predict response times (and accuracy?)
  • Test the model's predictions against a user study
  • Aim for VisWeek publication?

Identify potential modeling projects based on visual structure for future work...

  • Intrinsic quality measures of visual representations
  • How decision-making is affected by visualization design
  • Simple ways to define and measure the mental model of a visualization



David

  1. get diffusion normals, one library, and one executable distributed
  2. good TBI talk in Chicago
  3. support 5 phd students' + trevor's progress
  4. si^2 proposal for 6/14, then expedition?
  5. wrist proposal possibilities, w/eni (check with Trey?)
  6. keep Vis '11 on track



Eni

  • Make progress in the surface analysis/congruency problem
  • Draft a proposal for my work
  • Read more literature that’s related to my work
  • Submit a paper to MRM on tracts



Jadrian

  1. Write up dissertation table of contents, outline, and some hole-filled chapters by July 31st
    • Done.
  2. Write up departmental proposal document by September 1st
    • Initial submission on September 10th.
  3. Present the proposal formally to the department in October
    • Proposal presentation on October 7th.
  4. Define a macrostructure model and cost function
    • The committee has been very involved in refining the idea of the "cost functions" for various fitting steps. The macrostructure model has gone through several revisions and is almost done.
  5. Implement curve clustering using the macrostructure model; write up for ISMRM
    • Not done. Intended ISMRM submission on Rician noise correction turned out not to be novel, though I did learn about a ton of related work that has been quite successful.
  6. Extend the macrostructure cost function to include DWI values
    • Not done.
  7. Implement macrostructure adjustment from DWIs; write up for an MRM paper
    • Not done.
  8. Get preliminary histological data of some kind, either by doing it in-house, working with collaborators, or outsourcing
    • Not done.
  9. Derive a minimal set of microstructure measurements from histological data
    • Not done.
  10. Copy South Africa data from DVDs and work with Amanda to import and process it
    • All data are organized on the data server but not processed.



Nathan

  1. Streamline ROI selection programroi_select
  2. Streamline stats program
    • Line lengths and general statistics
    • Density: # of lines per mm2cancelled?
    • Calculate FA/MD along the entire length of the line
  3. Culling algorithm
  4. Try to replicate previous paper results using culling and ROI selection programs
  5. ...



Radu

  1. Learning distance metrics from users (with Cagatay)
  2. Finalize(revision)/Resubmit maps paper
  3. Analysis "nudge" pilot study
  4. Prepare thesis proposal talk
  5. Create a daphne-module map
  6. Deploy existent maps at Immgen
  7. Design collaborative module for maps + instrumentation



Wenjin

  • Neuroimage paper - submit asap even just with simulation results.
  • Axon application on real data: human/pig/macaque
  • IACUC - work with David on submission
  • IRB - work with David and Ed on submission
  • CV ready for job search in fall

Steve

Comps progress

  1. Receive brain+code dump from Trevor re: interaction histories (meet to discuss before 6/7)
  2. Application integration for interaction histories
    • Get G3D history library from Trevor asap, and implement sample app and some basic interactions w/ history collection by 6/20
    • BrainApp, Brain circuit vis?
  3. LCS algorithm over histories for required interaction patterns
    • first draft, test on synthetic data by 6/25
  4. Algorithm for remaining time estimation from pattern
    • first pass by 7/1

ImmGen

  1. Build Radu's code and look for contribution to extend tools (6/15) - meet with Radu?

Misc

  1. VASS Application/Registration
    • draft of app materials (essay, cv) by 6/1 (deadline: 7/23)
  2. Work on poster submission for vis (deadline: 7/1)
  3. Learn more about Caroline's work before she gets here (read her "Implied Dynamics" and "Visual Metaphors" papers)
  4. NSF Grad Fellowship application -- first draft on all parts by 8/30
    • search other fellowships

...



Ryan

  • Get oriented in lab and on campus
  • Progress with coursework
  • Work on NSF GRFP Application and Research Comps projects
    • Cortical connectivity (vis)
    • Surface registration (vis and modeling)
    • Surface descriptors (algo and applications)