Plans and Goals: Difference between revisions
Jump to navigation
Jump to search
| Line 30: | Line 30: | ||
* Thesis proposal | * Thesis proposal | ||
** Find committee members | ** Find committee members | ||
** Finish a draft | ** Finish a draft that has | ||
*** a realistic timeline from now until defense | |||
*** detailed plan for at least one paper that could be part of the thesis | |||
=== [[User:Steven Gomez|Steve]] (Spring '14) === | === [[User:Steven Gomez|Steve]] (Spring '14) === | ||
Revision as of 19:31, 17 January 2014
On this page the members of the VRL record and refine their goals for the current semester. This is a living document in which dhl will provide feedback. See the bottom of the page for links to past plans & goals documents.
Current Schedule
Meetings are on Mondays. The authoritative list is in dhl's calendar.
Current Plans and Goals (Summer/Fall '13)
Connor
Goals
- Finish third and second to last classes
- Rethink my research comp direction
- Finish a more specific, testable study
- Pilot study
- Establish list of todos for biovis part of research comps
- Have runnable prototype by end of semester
Hua
- BraiNet
- Improve the prototype to qualify for a submission
- Submit
- Network edge uncertainty visualization
- Draft paper with everything except final analysis results
- Finish running users
- Submit to InfoVis (March 31)
- Aptima
- Submit to VIS (March 31)
- Crowd-based visualization evaluation
- Perform temporal analysis on the data (Jan. 31)
- Submit to VIS (March 31)
- Thesis proposal
- Find committee members
- Finish a draft that has
- a realistic timeline from now until defense
- detailed plan for at least one paper that could be part of the thesis
Steve (Spring '14)
- Teach CS 0931
- TA camp starting Jan 16
- Prepare and practice each lecture and activity
- Maintain open communication and availability with TAs and students
- Have fast turn-around on students' grades
- Crowd Eyetracking project
- Redraft paper without any additional content from CHI submission by Jan 10 and circulate
- Revise as needed and possibly add more eyetracking users
- Submit to InfoVis: abstract on March 21, full paper on March 31
- Aptima project
- Incorporate changes to experiment protocol from pilot study
- Finish running users by Jan 31
- Finish analysis by Feb 15
- Draft paper by March 7
- Submit to VAST: abstract on March 21, full paper on March 31
- Misc
- Submit IRB renewal by Jan 13 at the latest
- Complete CHI 2014 Work-in-Progress Program Committee duties; all wrapped up with meta-reviews by Feb 4
Ryan
- Submit a thesis proposal
- Be a good TA for CS137
- Give good talks at MICCAI
- Contribute to crowdsourcing paper
- Keep up with St. Louis folks
- Define and start South Africa analysis
- Keep up contact with Dan
Connor
Goals
- Submit VIS poster using 237 data
- Run paper prototype study
- Implement client/server cancer analysis tool capable of serving dynamic views
- Carry MTurk experiment from perception class as far as deemed fit
- Help IVRG MTurk project wrap up
Important dates:
- June 13-25: San Francisco; working ~9-5 M-F with e-mail access
- June 27: Poster deadline
- July 13-August 5: Ghana (Volta Region, Accra, Cape Coast); limited to no e-mail access
David
- get Jadrian graduated
- Cave operational by end of summer
- at least front wall, with blending and Cave Painting
- excellent cs237
- prep for cool, new(ish?) cs16 for Spring
- December Expeditions in Computing submission
- volume rendering interaction in WristVis
- brain metrics papers out with Ryan
- longer-term funding matched with group
Anne
Goals
- Continue construction of the new Cave as parts arrive
- Complete 1-3 demos for the Cave (not from scratch - adapting code from other sources)
- some of: Tom Banchoff, Mandelbox Fractal, Music Visualizer
- Have running in the Cave by the end of the summer
- Work on one long-term Cave project of use to scientists
- understand the science behind the simulation or tool
- develop and maintain a good relationship with scientists to encourage further productive use of the Cave.
- Prepare for GREs, take in August.
Steven
Goals
- Maintain CMCOA pipeline
- Fix SIGUSR1 issue and asssociated radius registration issues
- Provide troubleshooting and fix bugs if they arise - including the recent problems with the linux upgrade
- Install levmar and use to replace NAG library calls within CMCOA pipeline
- Work at making CIT-side portion of pipeline more user-friendly so that it is accessible to people without linux and programming experience
- Assist with construction of Cave
Wesley
- Finish new CAVE construction
- Get ParaView working on both the new CAVE and the old one
- Get CavePainting (and other VRG3D applications by extension) working on both the new CAVE and the old one
- Speak with faculty interested in working with the CAVE and compile a list of interests
- Work with different VR frameworks and get them running in the CAVE