Plans and Goals

From VrlWiki
Revision as of 22:05, 10 June 2013 by Anne Kenyon (talk | contribs) (Anne)
Jump to navigation Jump to search

On this page the members of the VRL record and refine their goals for the current semester. This is a living document in which dhl will provide feedback. See the bottom of the page for links to past plans & goals documents.

Current Schedule

Meetings are on Mondays. The authoritative list is in dhl's calendar.

Current Plans and Goals (Summer '13)

Connor

Goals

  • Submit VIS poster using 237 data
  • Run paper prototype study
  • Implement client/server cancer analysis tool capable of serving dynamic views
  • Carry MTurk experiment from perception class as far as deemed fit
  • Help IVRG MTurk project wrap up

Important dates:

  • June 13-25: San Francisco; working ~9-5 M-F with e-mail access
  • June 27: Poster deadline
  • July 13-August 5: Ghana (Volta Region, Accra, Cape Coast); limited to no e-mail access

Anne

Goals

  • Continue construction of the new Cave as parts arrive
  • Complete 1-3 demos for the Cave (not from scratch - adapting code from other sources)
    • some of: Tom Banchoff, Mandelbox Fractal, Music Visualizer
    • Have running in the Cave by the end of the summer
  • Work on one long-term Cave project of use to scientists
    • understand the science behind the simulation or tool
    • develop and maintain a good relationship with scientists to encourage further productive use of the Cave.
  • Prepare for GREs, take in August.



Past Plans and Goals