Plans and Goals: Difference between revisions
Jump to navigation
Jump to search
Anne Kenyon (talk | contribs) |
|||
| Line 18: | Line 18: | ||
* June 27: Poster deadline | * June 27: Poster deadline | ||
* July 13-August 5: Ghana (Volta Region, Accra, Cape Coast); limited to no e-mail access | * July 13-August 5: Ghana (Volta Region, Accra, Cape Coast); limited to no e-mail access | ||
=== [[User:Anne Kenyon|Anne]] === | |||
Goals | |||
* Continue construction of the new CAVE as parts arrive | |||
* Complete 1-3 demos for the CAVE (not from scratch -- adapting code to work in CAVE) | |||
* Work on one long-term CAVE project | |||
Revision as of 21:58, 10 June 2013
On this page the members of the VRL record and refine their goals for the current semester. This is a living document in which dhl will provide feedback. See the bottom of the page for links to past plans & goals documents.
Current Schedule
Meetings are on Mondays. The authoritative list is in dhl's calendar.
Current Plans and Goals (Summer '13)
Connor
Goals
- Submit VIS poster using 237 data
- Run paper prototype study
- Implement client/server cancer analysis tool capable of serving dynamic views
- Carry MTurk experiment from perception class as far as deemed fit
- Help IVRG MTurk project wrap up
Important dates:
- June 13-25: San Francisco; working ~9-5 M-F with e-mail access
- June 27: Poster deadline
- July 13-August 5: Ghana (Volta Region, Accra, Cape Coast); limited to no e-mail access
Anne
Goals
- Continue construction of the new CAVE as parts arrive
- Complete 1-3 demos for the CAVE (not from scratch -- adapting code to work in CAVE)
- Work on one long-term CAVE project