Steven Gomez (talk | contribs) →Current Plans and Goals (Summer/Fall '13): Added spring goals for steveg |
|||
| Line 6: | Line 6: | ||
== Current Plans and Goals (Summer/Fall '13) == | == Current Plans and Goals (Summer/Fall '13) == | ||
=== [[User:Connor Gramazio|Connor]] | === [[User:Connor Gramazio|Connor]] === | ||
Goals | Goals | ||
* Finish third and second to last classes | * Finish third and second to last classes | ||
| Line 15: | Line 15: | ||
** Have runnable prototype by end of semester | ** Have runnable prototype by end of semester | ||
=== [[User:Hua Guo|Hua]] | === [[User:Hua Guo|Hua]] === | ||
* BraiNet | * BraiNet | ||
** Get Mark on board with resource paper drafting | ** Get Mark on board with resource paper drafting | ||
| Line 28: | Line 28: | ||
** Work with others to have a submission on temporal analysis of click data to reveal visualization patterns | ** Work with others to have a submission on temporal analysis of click data to reveal visualization patterns | ||
=== [[User:Steven Gomez|Steve]] ( | === [[User:Steven Gomez|Steve]] (Spring '14) === | ||
* | * Teach CS 0931 | ||
* | ** TA camp starting '''Jan 16''' | ||
** | ** Prepare and practice each lecture and activity | ||
** ''' | ** Maintain open communication and availability with TAs and students | ||
** ''' | ** Have fast turn-around on students' grades | ||
** ''' | |||
* Crowd Eyetracking project | |||
** Redraft paper without any additional content from CHI submission by '''Jan 10''' and circulate | |||
** Revise as needed and possibly add more eyetracking users | |||
** Submit to InfoVis: abstract on '''March 21''', full paper on '''March 31''' | |||
* Aptima project | |||
** Incorporate changes to experiment protocol from pilot study | |||
** Finish running users by '''Jan 31''' | |||
** Finish analysis by '''Feb 15''' | |||
** Draft paper by '''March 7''' | |||
** Submit to VAST: abstract on '''March 21''', full paper on '''March 31''' | |||
* | * Misc | ||
** Submit IRB renewal by '''Jan 13''' at the latest | |||
** ''' | ** Complete CHI 2014 Work-in-Progress Program Committee duties; all wrapped up with meta-reviews by '''Feb 4''' | ||
** | |||
=== [[User:Ryan Cabeen|Ryan]] | === [[User:Ryan Cabeen|Ryan]] === | ||
* Submit a thesis proposal | * Submit a thesis proposal | ||
Revision as of 23:05, 4 January 2014
On this page the members of the VRL record and refine their goals for the current semester. This is a living document in which dhl will provide feedback. See the bottom of the page for links to past plans & goals documents.
Current Schedule
Meetings are on Mondays. The authoritative list is in dhl's calendar.
Current Plans and Goals (Summer/Fall '13)
Connor
Goals
- Finish third and second to last classes
- Rethink my research comp direction
- Finish a more specific, testable study
- Pilot study
- Establish list of todos for biovis part of research comps
- Have runnable prototype by end of semester
Hua
- BraiNet
- Get Mark on board with resource paper drafting
- Incorporate connectivity data from Allen Brain Atlas
- Network edge uncertainty visualization
- Get lab pilot study done before mid-October
- Refine the study design and run more experiments / analysis to prepare for a VIS'14 paper
- Aptima
- Finish prototyping and perform evaluation
- Draft a viewpoint article on sptial-temporal network patterns.
- Crowd-based visualization evaluation
- Work with others to have a submission on temporal analysis of click data to reveal visualization patterns
Steve (Spring '14)
- Teach CS 0931
- TA camp starting Jan 16
- Prepare and practice each lecture and activity
- Maintain open communication and availability with TAs and students
- Have fast turn-around on students' grades
- Crowd Eyetracking project
- Redraft paper without any additional content from CHI submission by Jan 10 and circulate
- Revise as needed and possibly add more eyetracking users
- Submit to InfoVis: abstract on March 21, full paper on March 31
- Aptima project
- Incorporate changes to experiment protocol from pilot study
- Finish running users by Jan 31
- Finish analysis by Feb 15
- Draft paper by March 7
- Submit to VAST: abstract on March 21, full paper on March 31
- Misc
- Submit IRB renewal by Jan 13 at the latest
- Complete CHI 2014 Work-in-Progress Program Committee duties; all wrapped up with meta-reviews by Feb 4
Ryan
- Submit a thesis proposal
- Be a good TA for CS137
- Give good talks at MICCAI
- Contribute to crowdsourcing paper
- Keep up with St. Louis folks
- Define and start South Africa analysis
- Keep up contact with Dan
Connor
Goals
- Submit VIS poster using 237 data
- Run paper prototype study
- Implement client/server cancer analysis tool capable of serving dynamic views
- Carry MTurk experiment from perception class as far as deemed fit
- Help IVRG MTurk project wrap up
Important dates:
- June 13-25: San Francisco; working ~9-5 M-F with e-mail access
- June 27: Poster deadline
- July 13-August 5: Ghana (Volta Region, Accra, Cape Coast); limited to no e-mail access
David
- get Jadrian graduated
- Cave operational by end of summer
- at least front wall, with blending and Cave Painting
- excellent cs237
- prep for cool, new(ish?) cs16 for Spring
- December Expeditions in Computing submission
- volume rendering interaction in WristVis
- brain metrics papers out with Ryan
- longer-term funding matched with group
Anne
Goals
- Continue construction of the new Cave as parts arrive
- Complete 1-3 demos for the Cave (not from scratch - adapting code from other sources)
- some of: Tom Banchoff, Mandelbox Fractal, Music Visualizer
- Have running in the Cave by the end of the summer
- Work on one long-term Cave project of use to scientists
- understand the science behind the simulation or tool
- develop and maintain a good relationship with scientists to encourage further productive use of the Cave.
- Prepare for GREs, take in August.
Steven
Goals
- Maintain CMCOA pipeline
- Fix SIGUSR1 issue and asssociated radius registration issues
- Provide troubleshooting and fix bugs if they arise - including the recent problems with the linux upgrade
- Install levmar and use to replace NAG library calls within CMCOA pipeline
- Work at making CIT-side portion of pipeline more user-friendly so that it is accessible to people without linux and programming experience
- Assist with construction of Cave
Wesley
- Finish new CAVE construction
- Get ParaView working on both the new CAVE and the old one
- Get CavePainting (and other VRG3D applications by extension) working on both the new CAVE and the old one
- Speak with faculty interested in working with the CAVE and compile a list of interests
- Work with different VR frameworks and get them running in the CAVE