* Continue construction of the new | * Continue construction of the new Cave as parts arrive | ||
* Complete 1-3 demos for the | * Complete 1-3 demos for the Cave (not from scratch - adapting code from other sources) | ||
* Work on one long-term | ** some of: Tom Banchoff, Mandelbox Fractal, Music Visualizer | ||
** Have running in the Cave by the end of the summer | |||
* Work on one long-term Cave project of use to scientists | |||
** understand the science behind the simulation or tool | |||
** develop and maintain a good relationship with scientists to encourage further productive use of the Cave. | |||
* Prepare for GREs, take in August. | |||
<!-- please don't edit below this line --> | <!-- please don't edit below this line --> | ||
Revision as of 22:05, 10 June 2013
On this page the members of the VRL record and refine their goals for the current semester. This is a living document in which dhl will provide feedback. See the bottom of the page for links to past plans & goals documents.
Current Schedule
Meetings are on Mondays. The authoritative list is in dhl's calendar.
Current Plans and Goals (Summer '13)
Connor
Goals
- Submit VIS poster using 237 data
- Run paper prototype study
- Implement client/server cancer analysis tool capable of serving dynamic views
- Carry MTurk experiment from perception class as far as deemed fit
- Help IVRG MTurk project wrap up
Important dates:
- June 13-25: San Francisco; working ~9-5 M-F with e-mail access
- June 27: Poster deadline
- July 13-August 5: Ghana (Volta Region, Accra, Cape Coast); limited to no e-mail access
Anne
Goals
- Continue construction of the new Cave as parts arrive
- Complete 1-3 demos for the Cave (not from scratch - adapting code from other sources)
- some of: Tom Banchoff, Mandelbox Fractal, Music Visualizer
- Have running in the Cave by the end of the summer
- Work on one long-term Cave project of use to scientists
- understand the science behind the simulation or tool
- develop and maintain a good relationship with scientists to encourage further productive use of the Cave.
- Prepare for GREs, take in August.