Plans and Goals

From VrlWiki
Jump to navigation Jump to search

On this page the members of the VRL record and refine their goals for the current semester. This is a living document in which dhl will provide feedback. See the bottom of the page for links to past plans & goals documents.

Current Schedule

Meetings are on Tuesdays. The authoritative list is in dhl's calendar.

  • 1:50 - jadrian
  • 2:00 - wenjin
  • 2:10 - eni
  • 2:20 - jadrian
  • 2:30 - bb
  • 2:40 - dtr
  • 2:50 - trevor
  • 3:00 - cad
  • 3:10 - steve
  • 3:20 - radu

Current Plans and Goals (Summer/Fall '10)

Caroline

Get oriented

  • Find out current status of framework
  • Acquaint myself with any existing modules / code / results
  • Find out who else will be working on it or has worked on it, meet with them
  • Literature review
  • Learn CPM-GOMS, refresh on ACT-R

Do whatever needs to be done to get framework going

Create a test module based on my earlier implied dynamics work [1]

  • Model a dynamics-based assessment of relationships between parts of simple visualizations
  • Test whether this can predict users' actual evaluations of a chart's structural properties
  • Maybe rethink to tie in more to affordances, interface prediction

Identify other potential modeling projects based on visual structure for future work...

  • Predicting the patterns (trends, clusters, etc.) a user sees in a visualization
  • Modeling how quickly a user can read high-level information from different vis types
  • Analyze interaction affordances in a visualization system

Get funded

  • Work on grant proposal
  • Find and apply for fellowships / postdoc grants

David

  1. get diffusion normals, one library, and one executable distributed
  2. good TBI talk in Chicago
  3. support 5 phd students' + trevor's progress
  4. si^2 proposal for 6/14, then expedition?
  5. wrist proposal possibilities, w/eni (check with Trey?)
  6. keep Vis '11 on track


Brad

Projects

  • Support the ongoing projects including collaborators. Active projects are wrist, brain, adviser, and protein.
  • Assist Radu to integrate a test and any recent code.
  • Migrate Win's mri pipeline to run in CIT.
  • Contribute to the design and development of the new cave. Integrate changes to vrg3d. Simplify the configuration and provide a quick start path for student projects.
  • Set up public distribution of diffusion imaging data.


Infrastructure

  • Manage the migration to the new file system.
  • Continue to write Wiki entries as needed.
  • Continue setting up third party software for students to use. Current imported packages are: blitz, cg, g3d, qt, camino, dtk, afni, nifti, vivro, vrpn, glut, and sdl.
  • Extend the build system to make kits for public source and binary distributions.
  • Improve support for remote development.
  • Launch the Windows test system.
  • Continue extend the make files to support new features such as additional third party packages.
  • Upgrade migrated Linux code to work with gcc 4.3 in conjunction with the summer Debian upgrade.
  • Continue to integrate any new tests written by students into nightly test runs.
  • Finish integrating the new version of the Nag libraries.


Knowledge

  • Learn more about the cave; particularly vrg3d software development.
  • Meet (SciVis talk) with students to address any integration issues.


Çağatay

  1. Resolve crossings, count cycles.


Radu

  1. Learning distance metrics from users (with Cagatay)
  2. Finalize(revision)/Resubmit maps paper
  3. Analysis "nudge" pilot study
  4. Prepare thesis proposal talk
  5. Create a daphne-module map
  6. Deploy existent maps at Immgen
  7. Design collaborative module for maps + instrumentation


Steve

  1. Receive brain+code dump from Trevor re: interaction histories
  2. VASS Application/Registration
    • shoot for June 1 (deadline: July 23)
  3. Work on poster submission for vis (deadline: July 1)
  4. Learn more about Caroline's work before she gets here

Immgen

  1. Learn more about immgen, their projects
  2. Find contribution to extend their genome vis tools (with Radu?)

Comps progress

  1. Application integration for interaction histories
    • BrainApp?, Brain circuit vis?
  2. LCS algorithm over histories for required interaction patterns
  3. Algorithm for remaining time estimation from pattern

Knowledge

  1. Read more papers in cognitive science, brain science
  2. Learn more about experimental design

...

Eni

  • Make progress in the surface analysis/congruency problem
  • Draft a proposal for my work
  • Read more literature that’s related to my work
  • Submit a paper to MRM on tracts

Nathan

  1. Streamline ROI selection program
    • Axis-aligned ROIs
    • Bitmap ROIs
  2. Apply ROI program to known dataset for purposes of verification
  3. ...

Past Plans and Goals