Plans and Goals: Difference between revisions

From VrlWiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 14: Line 14:
* 3:20 - cad
* 3:20 - cad


== Current Plans and Goals (Spring '10) ==
=== [[User:Brad Berg|Brad]] ===
Projects
* Support the ongoing projects including collaborators.  Active projects are wrist, brain, adviser, and protein.
* Assist Radu to integrate a test and any recent code.
* Contribute to the design and development of the new cave.  This includes integrating g3d, vrpn and hosting vrg3d.  Once the software is running simplify the configuration and provide a quick start path for student projects.
* Set up a distribution of diffusion imaging data.
Infrastructure
* Continue to write Wiki entries as needed.
* Continue setting up external software for students to use. Current imported packages are:  blitz, cg, g3d, qt, camino, dtk, vrpn, glut, and sdl.
* Finish extending make files for local installs and kits for source and binary distributions.
* Continue to make improvements to the make files so they are easier to use.
* Upgrade migrated Linux code to work with gcc 4.3.
* Continue to integrate any new tests written by students into nightly test runs.
* Finish integrating the new version of the Nag libraries.
Knowledge
* Learn more about the cave; particularly vrg3d software development.
* Meet (SciVis talk) with students to address any integration issues.
* Learn how to manage a project using Source Forge.
----
== Current Plans and Goals (Fall '09) ==
== Current Plans and Goals (Fall '09) ==
=== Çağatay ===
# Incorporate feedback from the committee into the[[:Image:Çağatay's_thesis_ideas.pdf | proposal]]
# Start working realizing the finalized proposal.
# Submit the histogram embedding work to ISMRM.
# Submit the surface deformation work to SIGGRAPH.
----


=== [[User:Andy Forsberg|Andy]] ===
=== [[User:Andy Forsberg|Andy]] ===
Line 31: Line 79:


=== [[User:Brad Berg|Brad]] ===
=== [[User:Brad Berg|Brad]] ===


Projects
Projects


* Support the ongoing projects including collaborators.  Active projects are wrist, brain, adviser, and protein.
* Support the ongoing projects including collaborators.  Active projects are wrist, brainapp, adviser, and protein.


* Assist Radu to integrate a test and any recent code.
* Assist Radu to integrate a test and any recent code.


* Contribute to the design and development of the new cave.  This includes integrating g3d, vrpn and hosting vrg3d.  Once the software is running simplify the configuration and provide a quick start path for student projects.
* Contribute to the design of the new cave.


* Set up a distribution of diffusion imaging data.


Infrastructure
Infrastructure
Line 46: Line 94:
* Continue to write Wiki entries as needed.
* Continue to write Wiki entries as needed.


* Continue setting up external software for students to use. Current imported packages are:  blitz, cg, g3d, qt, camino, dtk, vrpn, glut, and sdl.
* Continue setting up external software for students to use. Current imported packages are:  blitz, cg, g3d, qt, and xerces


* Finish extending make files for local installs and kits for source and binary distributions.
* Extend make files for local installs and kits for source and binary distributions.


* Continue to make improvements to the make files so they are easier to use.
* Continue to make improvements to the make files so they are easier to use and to provide Windows support.


* Upgrade migrated Linux code to work with gcc 4.3.
* Upgrade migrated Linux code to work with gcc 4.3.
Line 56: Line 104:
* Continue to integrate any new tests written by students into nightly test runs.
* Continue to integrate any new tests written by students into nightly test runs.


* Finish integrating the new version of the Nag libraries.
* Integrate the new version of the Nag libraries.




Knowledge
Knowledge


* Learn more about the cave; particularly vrg3d software development.
* Learn more about the cave; particularly software development.


* Meet (SciVis talk) with students to address any integration issues.
* Meet (SciVis talk) with students to address any integration issues.


* Learn how to manage a project using Source Forge.


----
----

Revision as of 19:50, 18 December 2009

On this page the members of the VRL record and refine their goals for the current semester. This is a living document in which dhl will provide feedback. See the bottom of the page for links to past plans & goals documents.

Current Schedule

Meetings are on Monday.

  • 2:00 - steve
  • 2:10 - jadrian
  • 2:20 - radu
  • 2:30 - Brad
  • 2:40 - dtr
  • 2:50 - trevor
  • 3:00 - wzhou
  • 3:10 - Eni
  • 3:20 - cad


Current Plans and Goals (Spring '10)

Brad

Projects

  • Support the ongoing projects including collaborators. Active projects are wrist, brain, adviser, and protein.
  • Assist Radu to integrate a test and any recent code.
  • Contribute to the design and development of the new cave. This includes integrating g3d, vrpn and hosting vrg3d. Once the software is running simplify the configuration and provide a quick start path for student projects.
  • Set up a distribution of diffusion imaging data.

Infrastructure

  • Continue to write Wiki entries as needed.
  • Continue setting up external software for students to use. Current imported packages are: blitz, cg, g3d, qt, camino, dtk, vrpn, glut, and sdl.
  • Finish extending make files for local installs and kits for source and binary distributions.
  • Continue to make improvements to the make files so they are easier to use.
  • Upgrade migrated Linux code to work with gcc 4.3.
  • Continue to integrate any new tests written by students into nightly test runs.
  • Finish integrating the new version of the Nag libraries.


Knowledge

  • Learn more about the cave; particularly vrg3d software development.
  • Meet (SciVis talk) with students to address any integration issues.
  • Learn how to manage a project using Source Forge.

Current Plans and Goals (Fall '09)

Çağatay

  1. Incorporate feedback from the committee into the proposal
  2. Start working realizing the finalized proposal.
  3. Submit the histogram embedding work to ISMRM.
  4. Submit the surface deformation work to SIGGRAPH.

Andy

  1. mri/wrist
    1. tools
      1. registration, classification, distance-field calculation, bone proximity calc.
      2. graphical visualization/verification?
    2. modeling?
  2. $G (nightly tests, architecture, outside test-case = ADVISER)
  3. future funding candidates
    1. volume data visualization/analysis
    2. flow visualization w/ leopold/GK
    3. other?

Brad

Projects

  • Support the ongoing projects including collaborators. Active projects are wrist, brainapp, adviser, and protein.
  • Assist Radu to integrate a test and any recent code.
  • Contribute to the design of the new cave.


Infrastructure

  • Continue to write Wiki entries as needed.
  • Continue setting up external software for students to use. Current imported packages are: blitz, cg, g3d, qt, and xerces
  • Extend make files for local installs and kits for source and binary distributions.
  • Continue to make improvements to the make files so they are easier to use and to provide Windows support.
  • Upgrade migrated Linux code to work with gcc 4.3.
  • Continue to integrate any new tests written by students into nightly test runs.
  • Integrate the new version of the Nag libraries.


Knowledge

  • Learn more about the cave; particularly software development.
  • Meet (SciVis talk) with students to address any integration issues.



Çağatay

  1. Incorporate feedback from the committee into the proposal
  2. Start working realizing the finalized proposal.
  3. Submit the histogram embedding work to ISMRM.
  4. Submit the surface deformation work to SIGGRAPH.

David

  1. figure out software and data dissemination and get implemented with bb's help
  2. wrist proposal submission (dec supporting role; earlier with Trevor?)
  3. harvard stuff moving; read Janeway?
  4. support 6 phd students' progress
  5. write a plan for HCI modeling work (draft by 10/23, rev by 11/20)
  6. minimize professional service
  7. vis2011 sited, early committee defined after Vis by 10/16

Eni

  • submit tract integrity vs. cognitive tests abstract and histograms abstract to ismrm
  • possibly write a paper on the wrist comparison study (old/new subjects)
  • while working on different wrist problems, think of a problem I might want to focus on
  • do well in the courses I'm taking

Jadrian

Initial thesis proposal, submitted 2009-06-22

  1. Incorporate committee's comments into my proposal by 2009-10-15
    • Revision complete 2009-10-15
  2. Make a list of papers to spawn from the proposal by 2009-10-15
    • Incomplete
  3. Decide with dhl on the role of animal models in the proposal
    • Histological "wetwork" will play an important role in the research; significant planning and collaboration-building took place this semester
  4. Finish clustering code sufficient for an initial version of the backsolving system
    • Incomplete
  5. Find or build implementations of a more sophisticated tractography technique (Q-ball or Gordon's multi-tensor)
    • DTK & Trackvis installed and working with current data as of 2009-11-04
  6. Work with Ed Walsh, dhl, and wzhou to settle on some HARDI parameters
    • Scan parameters have not been decided but ongoing work with Steve's group is teaching us all more about parameter tradeoffs
  7. Take one HARDI scan by 2009-11-24
    • No new scan was acquired this fall, pending a decision about scan parameters
  8. Get DifSim (the MCell-based UCSD diffusion simulator) installed and working here
    • Not installed due to ongoing license issues, but I'm in communication with the developers and confident that it'll work out

Radu

  1. Deploy existing visualization tools by Oct 15 (in Labs and in CVS - Protein-version2, Clustering apps)
  2. Migrate BrainApp functionality to the new framework by Nov 1 (help from Cagatay and Eni)
  3. Test usefulness of the QT vis framework (on Cagatay); if useful deploy by Nov 1
  4. Advance Immgen
    1. Write report for next year
    2. Daphne-data vis prototype by Nov 1
    3. Genome-google maps operation by Oct1
    4. Broad display operational
    5. Paper on analyzing and disseminating large visualizations?
  5. Gather vis tools usage data
  6. Proposal
    1. Gather, read and summarize cogsci and linked visualization literature
  7. 2D interaction on stream-tubes study? Paper?
  8. Successful Vis talk
  9. Proposal is here

Trevor

  1. Research comps!
  2. Review and address EuroVis reviews for cell paper.
    1. Submit to PacVis?
  3. Research comps work --> i3d submission.
  4. Narrow long term focus.
  5. Foster collaborations:
    1. Paul Kulesa
    2. Trey Crisco
    3. Sharon Swartz
  6. Finish course requirements.

Wenjin

  • Finalize Proposal: incorporate feedback from committee in NIH format
  • Survive NEUR 1650
  • Analytical model tested on simulation data to accomplish 1-2 of the following (based on current limitations):
    • estimate axon parameter for unknown fiber direction
    • recover small axon radii < 4 micrometer
    • estimation with clinically achievable acquisitions
    • build and evaluate 4-compartment model with water exchange vs. 2-compartment
  • Derive and test optimal imaging parameters on Brown 3T scanner
  • submit to ISMRM (Nov. 10th) or MICCAI in March
  • prepare for MRM/TMI journal submission

Steve

Course work

  • Explore courses that may be relevant to research interests, or may help me think more outside-the-box
  • Use project classes to explore interests in graphics, vis, hci

Research

  • Draft R&R plan for spring semester by 11/15
  • Start thinking about research comp ideas and proposal by 11/15
  • Contribute to the VRL however I can
  • Search through past ideas/projects worth investigating more by 10/1
    • Online raytracing with voronoi diagrams?
    • Interfaces that learn?

Personal

  • Get adjusted to Brown, Providence, graduate school
    • Work on time management, organization
  • Pass programming comp in January

Past Plans and Goals