Action Items for Sept. 15th, 2009

From VrlWiki
Revision as of 15:32, 18 September 2009 by Sharon King (talk | contribs)
Jump to navigation Jump to search
  • Travel/visit planning (Sam) Put together a list of questions for the trip today. If Sam can't do it, then John can take a first pass at it by tomorrow (9/16). Need list before scheduling trip. Send blackout dates for travel to Sam through October 31.
  • Timeline due today; intergration by Tuesday (9/22) (John)