User:Jadrian Miles/OKRs: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 12: | Line 12: | ||
** Key result: Complete first draft to dhl within a week of finishing experiment 3. | ** Key result: Complete first draft to dhl within a week of finishing experiment 3. | ||
** Key result: Paper submitted to MRM by end of August. | ** Key result: Paper submitted to MRM by end of August. | ||
* Objective: Design and evaluate a curve-bundle model. | * Objective: Design, implement, and evaluate a curve-bundle model. | ||
** Key result: | ** Key result: Bundle model initialized from existing cluster data by '''06/22'''. | ||
** Key result: Bundle joining and splitting implemented by '''06/29'''. | |||
Revision as of 20:14, 12 June 2012
Today's Date: 12/10
- Meta-objective: make measurable progress toward the dissertation.
- Key result: TODO
- Meta-objective: concretely demonstrate the success of the real-problem technique.
- Demonstrate (by pictures) specific challenging regions in which the multi-scale approach reconstructs structures better than two competitors.
- Demonstrate (numerically) that image reconstruction, as measured by chi-squared goodness-of-fit on real data, is better than two competitors.
- Demonstrate (in prose, or maybe with a quick user study) that selection tasks for specific brain structures are easier and more precise than with ROI+tractography methods.
- Objective: Write and submit the tract noise paper in a timely manner.
- Key result: Experiments 1 & 2, plus analysis and figures, are finished by 06/19.
- Key result: Experiment 3 is finished within two weeks of the IIT data posting online.
- Key result: Complete first draft to dhl within a week of finishing experiment 3.
- Key result: Paper submitted to MRM by end of August.
- Objective: Design, implement, and evaluate a curve-bundle model.
- Key result: Bundle model initialized from existing cluster data by 06/22.
- Key result: Bundle joining and splitting implemented by 06/29.