== Steve's Project Schedule ==
== Project Schedule ==


'''Nov 1''' -- Filling out the paper: Abstract, related work and intro drafted; outlines for results and methods.  Update on data and contact with Win.
'''Nov 1''' -- Filling out the paper: Abstract, related work and intro drafted; outlines for results and methods.  Update on data and contact with Win.
Line 14: Line 14:


'''Dec 13''' -- Final draft, two-page extended abstract of research project
'''Dec 13''' -- Final draft, two-page extended abstract of research project
== Report Drafts ==
* [[media:6nov2011-cs295j-report-steveg.pdf]], 19:13, 6 November 2011 (EST)


== Boards ==
== Boards ==

Revision as of 00:13, 7 November 2011

Project Schedule

Nov 1 -- Filling out the paper: Abstract, related work and intro drafted; outlines for results and methods. Update on data and contact with Win.

Nov 8 -- Test MRIs (hopefully 10) collected and organized; evaluation protocol completed

Nov 15 -- Video captures of research assistants analyzing MRIs for QA (first session)

Nov 22 -- continued: Video captures of research assistants analyzing MRIs for QA (second session)

Nov 29 -- Coding of video captures completed; will share findings

Dec 6 -- Analysis of codings; figures for final paper created

Dec 13 -- Final draft, two-page extended abstract of research project