CS295J/Project Schedule:Steve: Difference between revisions

From VrlWiki
Jump to navigation Jump to search
No edit summary
Line 14: Line 14:


'''Dec 13''' -- Final draft, two-page extended abstract of research project
'''Dec 13''' -- Final draft, two-page extended abstract of research project
== Boards ==
<center>
<gallery widths="300px" heights="250px" caption="Poster sketches and in-class critiques ">
Image:Steve_Poster_20_Oct_2011.JPG | Oct 20, 2011
Image:Steve_Poster_18_Oct_2011.JPG | Oct 18, 2011
Image:Steveg_Board_13oct2011.jpg | Oct 13, 2011
</gallery>
</center>

Revision as of 20:24, 24 October 2011

Steve's Project Schedule

Nov 1 -- Filling out the paper: Abstract, related work and intro drafted; outlines for results and methods. Update on data and contact with Win.

Nov 8 -- Test MRIs (hopefully 10) collected and organized; evaluation protocol completed

Nov 15 -- Video captures of research assistants analyzing MRIs for QA (first session)

Nov 22 -- continued: Video captures of research assistants analyzing MRIs for QA (second session)

Nov 29 -- Coding of video captures completed; will share findings

Dec 6 -- Analysis of codings; figures for final paper created

Dec 13 -- Final draft, two-page extended abstract of research project

Boards