== Steve's Project Schedule ==
== Steve's Project Schedule ==


'''Nov 1''' --
'''Nov 1''' -- Filling out the paper: Abstract, related work and intro drafted; outlines for results and methods.  Update on data and contact with Win.


'''Nov 8''' --
'''Nov 8''' -- Test MRIs (hopefully 10) collected and organized; evaluation protocol completed


'''Nov 15''' --
'''Nov 15''' -- Video captures of research assistants analyzing MRIs for QA (first session)


'''Nov 22''' --
'''Nov 22''' -- continued: Video captures of research assistants analyzing MRIs for QA (second session)


'''Nov 29''' --
'''Nov 29''' -- Coding of video captures completed; will share findings


'''Dec 6''' --
'''Dec 6''' -- Analysis of codings; figures for final paper created


'''Dec 13''' -- Final draft, two-page extended abstract of research project
'''Dec 13''' -- Final draft, two-page extended abstract of research project

Revision as of 19:49, 24 October 2011

Steve's Project Schedule

Nov 1 -- Filling out the paper: Abstract, related work and intro drafted; outlines for results and methods. Update on data and contact with Win.

Nov 8 -- Test MRIs (hopefully 10) collected and organized; evaluation protocol completed

Nov 15 -- Video captures of research assistants analyzing MRIs for QA (first session)

Nov 22 -- continued: Video captures of research assistants analyzing MRIs for QA (second session)

Nov 29 -- Coding of video captures completed; will share findings

Dec 6 -- Analysis of codings; figures for final paper created

Dec 13 -- Final draft, two-page extended abstract of research project