'''Nov 1''' -- Filling out the paper: Abstract, related work and intro drafted; outlines for results and methods. Update on data and contact with Win. | '''Nov 1''' -- Filling out the paper: Abstract, related work and intro drafted; outlines for results and methods. Update on data and contact with Win. | ||
| Line 14: | Line 14: | ||
'''Dec 13''' -- Final draft, two-page extended abstract of research project | '''Dec 13''' -- Final draft, two-page extended abstract of research project | ||
== Report Drafts == | |||
* [[media:6nov2011-cs295j-report-steveg.pdf]], 19:13, 6 November 2011 (EST) | |||
== Boards == | == Boards == | ||
Revision as of 00:13, 7 November 2011
Project Schedule
Nov 1 -- Filling out the paper: Abstract, related work and intro drafted; outlines for results and methods. Update on data and contact with Win.
Nov 8 -- Test MRIs (hopefully 10) collected and organized; evaluation protocol completed
Nov 15 -- Video captures of research assistants analyzing MRIs for QA (first session)
Nov 22 -- continued: Video captures of research assistants analyzing MRIs for QA (second session)
Nov 29 -- Coding of video captures completed; will share findings
Dec 6 -- Analysis of codings; figures for final paper created
Dec 13 -- Final draft, two-page extended abstract of research project