Plans and Goals: Difference between revisions

From VrlWiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 20: Line 20:


=== Andy ===
=== Andy ===
* comparison of 3d vector vis methods
# comparison of 3d vector vis methods
** run subjects, analysis, complete paper, submit to vis'09
## run subjects, analysis, complete paper, submit to vis'09
* mri/wrist
# mri/wrist
** tools
** tools
*** registration, classification, distance-field calculation, bone proximity calc.
*** registration, classification, distance-field calculation, bone proximity calc.

Revision as of 20:39, 5 January 2009

On this page the members of the VRL record and refine their goals for the current semester. This is a living document in which dhl will provide feedback. See the bottom of the page for links to past plans & goals documents.

Current Schedule

Meetings are on Monday.

  • 2:00 - asf
  • 2:10 - jadrian
  • 2:20 - radu
  • 2:30 - Jian
  • 2:40 - dtr
  • 2:50 - trevor
  • 3:00 - wzhou
  • 3:10 - Eni
  • 3:20 - dginsbur
  • 3:30 - Brad
  • 3:40 - cad
  • 3:50 - Laura

Current Plans and Goals

Andy

  1. comparison of 3d vector vis methods
    1. run subjects, analysis, complete paper, submit to vis'09
  2. mri/wrist
    • tools
      • registration, classification, distance-field calculation, bone proximity calc.
      • graphical visualization/verification?
    • modeling?
  • $G (nightly tests, architecture, outside test-case = ADVISER)
  • future funding candidates
    • volume data visualization/analysis
    • flow visualization w/ leopold/GK
    • other?

Brad


Cagatay


David


Eni


Jadrian


Jian


Laura


Radu


Sidra


Trevor


Wenjin


Wudan

Past Plans and Goals