CS295J/Project Schedule:CKS-NM: Difference between revisions
< CS295J
New page: 25 October–- Refine pilot procedure 1 November–– Half of relevant research completed, reviewable draft of (pilot) methods section 8 November–– Final related works/methods refin... |
No edit summary |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 9: | Line 9: | ||
22 November–– Pilot (aim for N = 7) and revised procedure (if necessary) complete | 22 November–– Pilot (aim for N = 7) and revised procedure (if necessary) complete | ||
29 November–– | 29 November–– 3/4 of subjects run | ||
6 December–– All | 6 December–– All subjects run/analysis attempted. | ||
13 December–– Data analysis complete and results section written | 13 December–– Data analysis complete and results section written/Abstract | ||
19 December-- Everything done | |||
Latest revision as of 18:07, 29 November 2011
25 October–- Refine pilot procedure
1 November–– Half of relevant research completed, reviewable draft of (pilot) methods section
8 November–– Final related works/methods refined and Interface Prototype
15 November–– Interface Done
22 November–– Pilot (aim for N = 7) and revised procedure (if necessary) complete
29 November–– 3/4 of subjects run
6 December–– All subjects run/analysis attempted.
13 December–– Data analysis complete and results section written/Abstract
19 December-- Everything done