Action Items for Sept. 15th, 2009: Difference between revisions

From VrlWiki
Jump to navigation Jump to search
No edit summary
No edit summary
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
* Travel/visit planning (Sam) Put together a list of questions for the trip today. If Sam can't do it, then John can take a first pass at it by tomorrow (9/16). Need list before scheduling trip. Send blackout dates for travel to Sam through October 31.
* Travel/visit planning (Sam) Put together a list of questions for the trip today. If Sam can't do it, then John can take a first pass at it by tomorrow (9/16). Need list before scheduling trip. Send blackout dates for travel to Sam through October 31.
* Timeline due today; intergration by Tuesday (9/22) (John)
* Timeline due today; integration by Tuesday (9/22) (John)
*
* Project management software initial setup by Tuesday, 9/22 (John/Sharon)
* G3D and VRG3D layer cake by Tuesday, 9/22 (Brad)
* Engines and Libraries - New Issue for wiki (John) by Tuesday, 9/22
* Cost sharing and ARRA reporting - (David) discuss with Jane
* FTE's and time commitment for people - PAFS: 5/5/5/10/25  asf/loomis/brad/sgf/john (Sharon/Jane)

Latest revision as of 15:38, 18 September 2009

  • Travel/visit planning (Sam) Put together a list of questions for the trip today. If Sam can't do it, then John can take a first pass at it by tomorrow (9/16). Need list before scheduling trip. Send blackout dates for travel to Sam through October 31.
  • Timeline due today; integration by Tuesday (9/22) (John)
  • Project management software initial setup by Tuesday, 9/22 (John/Sharon)
  • G3D and VRG3D layer cake by Tuesday, 9/22 (Brad)
  • Engines and Libraries - New Issue for wiki (John) by Tuesday, 9/22
  • Cost sharing and ARRA reporting - (David) discuss with Jane
  • FTE's and time commitment for people - PAFS: 5/5/5/10/25 asf/loomis/brad/sgf/john (Sharon/Jane)