New page: 25 October–- Refine pilot procedure 1 November–– Half of relevant research completed, reviewable draft of (pilot) methods section 8 November–– Final related works/methods refin...
 
No edit summary
Line 13: Line 13:
6 December–– All of subjects run (total N = 15)
6 December–– All of subjects run (total N = 15)


13 December–– Data analysis complete and results section written
13 December–– Data analysis complete and results section written/Abstract
 
20 December–– Abstract In

Revision as of 17:38, 1 November 2011

25 October–- Refine pilot procedure

1 November–– Half of relevant research completed, reviewable draft of (pilot) methods section

8 November–– Final related works/methods refined and Interface Prototype

15 November–– Interface Done

22 November–– Pilot (aim for N = 7) and revised procedure (if necessary) complete

29 November–– Half of subjects run (~7.5)

6 December–– All of subjects run (total N = 15)

13 December–– Data analysis complete and results section written/Abstract