<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>http://vrl.cs.brown.edu/wiki/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=Sharon+King</id>
	<title>VrlWiki - User contributions [en]</title>
	<link rel="self" type="application/atom+xml" href="http://vrl.cs.brown.edu/wiki/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=Sharon+King"/>
	<link rel="alternate" type="text/html" href="http://vrl.cs.brown.edu/wiki/index.php/Special:Contributions/Sharon_King"/>
	<updated>2026-04-20T02:14:42Z</updated>
	<subtitle>User contributions</subtitle>
	<generator>MediaWiki 1.43.1</generator>
	<entry>
		<id>http://vrl.cs.brown.edu/wiki/index.php?title=Action_Items_for_Oct._27th,_2009&amp;diff=3892</id>
		<title>Action Items for Oct. 27th, 2009</title>
		<link rel="alternate" type="text/html" href="http://vrl.cs.brown.edu/wiki/index.php?title=Action_Items_for_Oct._27th,_2009&amp;diff=3892"/>
		<updated>2009-11-02T15:43:15Z</updated>

		<summary type="html">&lt;p&gt;Sharon King: New page: Attendees: David, Sharon, John, Brad, Andy (Sam – sick)  &amp;#039;&amp;#039;&amp;#039;Agenda for meetings in CA&amp;#039;&amp;#039;&amp;#039;  John review with Sam to see if items need to be added Sam is sick and may not be well enough to ...&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Attendees: David, Sharon, John, Brad, Andy (Sam – sick)&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;Agenda for meetings in CA&#039;&#039;&#039; &lt;br /&gt;
John review with Sam to see if items need to be added&lt;br /&gt;
Sam is sick and may not be well enough to travel – not good as Sam needs to pick Gregg’s brain…..&lt;br /&gt;
Is it possible for Sam to call in or should we reschedule the trip? ( already done – planned for 11/11)&lt;br /&gt;
John needs to read paper on StarCAVE&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;Display discussion&#039;&#039;&#039;&lt;br /&gt;
Mitsubishi support is pretty responsive (Laservue). John got to tier 3 almost immediately but his call was the 1st one they’ve received re: 3D&lt;br /&gt;
Asked what graphics card we are using so they can recreate the problem there.&lt;br /&gt;
&lt;br /&gt;
LCD not fast enough and doesn’t do stereo. They are just coming out now, but problem will be the boarder.&lt;br /&gt;
Rear projection TV’s – very good still a better bet than LCD&lt;br /&gt;
&lt;br /&gt;
LG – Boarder less one (small boarder) – worth looking at&lt;br /&gt;
&lt;br /&gt;
Add issue: alternative display technologies – John to add to agenda and to wiki&lt;br /&gt;
Talk to Greg about this i.e. boarder less, projection. LCD w/fiber optics&lt;br /&gt;
Everything John has seen, rear projection TV is still the best option.&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;VRPN – Brad&#039;&#039;&#039;&lt;br /&gt;
Tried to build on all compilers&lt;br /&gt;
G3D- MS suite - only one they support. Can develop on Linux&lt;br /&gt;
Will not use unsupported versions of anything per DHL&lt;/div&gt;</summary>
		<author><name>Sharon King</name></author>
	</entry>
	<entry>
		<id>http://vrl.cs.brown.edu/wiki/index.php?title=New_CAVE_Design&amp;diff=3891</id>
		<title>New CAVE Design</title>
		<link rel="alternate" type="text/html" href="http://vrl.cs.brown.edu/wiki/index.php?title=New_CAVE_Design&amp;diff=3891"/>
		<updated>2009-11-02T15:31:12Z</updated>

		<summary type="html">&lt;p&gt;Sharon King: /* Weekly Cave action items */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=Hept-Cave Design Wiki=&lt;br /&gt;
&lt;br /&gt;
This page serves as a repository of the design issues, knowledge, and decisions for the new Brown Cave funded through an NSF grant from 2009-2013.&lt;br /&gt;
&lt;br /&gt;
== Weekly Cave action items ==&lt;br /&gt;
Below is a list of action items for each Cave design meeting.&lt;br /&gt;
* [[Action Items for Sept. 15th, 2009]]&lt;br /&gt;
* [[Action Items for Sept. 22nd, 2009]]&lt;br /&gt;
* [[Action Items for Sept. 29th, 2009]]&lt;br /&gt;
* [[Action Items for Oct. 27th, 2009]]&lt;br /&gt;
&lt;br /&gt;
== Initial Design Issues ==&lt;br /&gt;
&lt;br /&gt;
=== University facility ===&lt;br /&gt;
* Problem: What are the requirements for University researchers in general?&lt;br /&gt;
* Input needed&lt;br /&gt;
** Interview existing Cave-users and potential Cave-users to consider needs/requirements&lt;br /&gt;
* Experiments needed&lt;br /&gt;
** (None?)&lt;br /&gt;
* Decision: ?&lt;br /&gt;
&lt;br /&gt;
=== Display Surface Angles === &lt;br /&gt;
Assigned to DHL. Updates are due by 12:00 noon on 9/14.&lt;br /&gt;
&lt;br /&gt;
* Problem: What are the consequences of display surface angles and/or curvature (horizontal and vertical angles may be different)?&lt;br /&gt;
* Input needed&lt;br /&gt;
** Expert feedback from Acevedo re KAUST design choices&lt;br /&gt;
* Experiments needed&lt;br /&gt;
** Set up two side-by-side and top/bottom displays and evaluate anecdotally&lt;br /&gt;
* Decision: ?&lt;br /&gt;
&lt;br /&gt;
=== Blending/Butting at Display Boundaries ===&lt;br /&gt;
Assigned to SGF. Updates are due on 9/14 by 12:00 noon&lt;br /&gt;
* Problem: What are the consequences of tiling displays together?&lt;br /&gt;
* Input needed&lt;br /&gt;
** Expert feedback from sites with tiled displays like the ones we&#039;ll use (Calit2, Disney, KAUST)&lt;br /&gt;
* Experiments needed&lt;br /&gt;
** Setup 2 displays and report on artifacts at edge between them (color, geometry)&lt;br /&gt;
* Decision: ?&lt;br /&gt;
&lt;br /&gt;
=== Will commodity DLP projection technology work ===&lt;br /&gt;
* Problem: Are commodity DLP projection technologies high-enough quality &amp;amp; reliable for a next-gen Cave?&lt;br /&gt;
* Input needed&lt;br /&gt;
** An understanding of how much effort Mark Mine et al. at Disney have put in&lt;br /&gt;
** What is Mark&#039;s estimate on how much more time/effort it will take to have a high-quality display&lt;br /&gt;
** standard desktop text does not look good on Mitsubishi HDTVs.  Is that a &amp;quot;show stopper&amp;quot;?&lt;br /&gt;
** Why is a projector-based system worse than HDTV approach?&lt;br /&gt;
* Experiments needed&lt;br /&gt;
** ?&lt;br /&gt;
* Decision: ?&lt;br /&gt;
&lt;br /&gt;
=== Text with Checkerboard Stereo === &lt;br /&gt;
Assigned to JH. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
* Problem: What text resolution will be usable with checkerboard stereo and will that level be sufficient to do the experiments and applications that we want to do?&lt;br /&gt;
* Input needed&lt;br /&gt;
** Expert feedback from sites already experimenting with the displays we&#039;ll use (Calit2, Disney, KAUST)&lt;br /&gt;
* Experiments needed&lt;br /&gt;
** Compare visual angle of smallest comfortable text on desktop display versus on checkerboard stereo display.&lt;br /&gt;
* Decision: ?&lt;br /&gt;
&lt;br /&gt;
=== Floor Design === Assigned to SGF.&lt;br /&gt;
Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
=== Treadmill Options === &lt;br /&gt;
( not Omni-directional) Assigned to SGF. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
=== Fixed wall design, or can it unfold into a powerwall? === &lt;br /&gt;
Assigned to SGF.  Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
=== Ceiling Value, and Design Options === &lt;br /&gt;
Assigned to SGF. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
=== Contracting to an Integrator === &lt;br /&gt;
Assigned to SGF.  Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
* Problem: Would contracting to an integrator to build based on an RFP be effective?&lt;br /&gt;
* Input:&lt;br /&gt;
** Phone feedback from some of the potential integrators&lt;br /&gt;
* Decision:&lt;br /&gt;
&lt;br /&gt;
=== [[3D Tracking options]] === &lt;br /&gt;
Assigned to JH. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
* Problem: Would camera-based tracking be a value or time-sink for the Cave?&lt;br /&gt;
* Input:&lt;br /&gt;
** Talk with people using camera-based tracking (Calit2, Disney, KAUST, Lit3D, Iowa State, UNC?, ..)&lt;br /&gt;
* Experiments needed:&lt;br /&gt;
** Try first hand most promising camera-based tracking and document:&lt;br /&gt;
*** the degree to which it is: wireless, accurate, low-latency, unobtrusive&lt;br /&gt;
*** the degree to which it provides: head-tracking, wand-tracking, tracking of fingers/feet/body, tracking of &amp;quot;phicons&amp;quot;/props&lt;br /&gt;
* Decision: ?&lt;br /&gt;
&lt;br /&gt;
=== Hardware supporting usability studies === &lt;br /&gt;
Assigned to ASF. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
* Problem: is special hardware needed to support evaluation of Cave-like systems (e.g., devices that measure galvanic skin response (GSR))?&lt;br /&gt;
* Input needed&lt;br /&gt;
** Advice from Mel Slater (How does Mel decide when GSR, etc. is important?  How expensive is the system?)&lt;br /&gt;
** Mel says, &amp;quot;[we use] a device called Nexus 4, which has skin conductance, ECG, respiration, and can also be used for EMG and EEG. I think that it is of the order of 10K or less depending on how many channels are used.&amp;quot;.&lt;br /&gt;
** VRPN supports some GSR device -- Russ Taylor says to check with Mary Whitton to learn more&lt;br /&gt;
** Consider whether results from future (or past) studies would be significantly improved with such devices?&lt;br /&gt;
*** asf thoughts (may be wrong!): GSR helps detects changes in a person&#039;s &amp;quot;comfort&amp;quot;-- this might reflect the level of frustration or happiness while evaluating some user interaction or visualization method that the person doesn&#039;t verbalize; that may be useful additional information for formal studies.  PTSD studies would benefit from the information, I should think.  However, if the device requires stringing wires all around, it might cause subjects to behave differently which would be bad.&lt;br /&gt;
* Experiments needed&lt;br /&gt;
** none&lt;br /&gt;
* Decision: ?&lt;br /&gt;
&lt;br /&gt;
=== Software: commercial quality === &lt;br /&gt;
Assigned to JH. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
* Problem: What do we need to do to make sure that commercial software will be usable in our new facility?&lt;br /&gt;
* Input:&lt;br /&gt;
** Feedback from some of the software players (Avizo/Amira, Ensight, OpenSceneGraph, ParaView)&lt;br /&gt;
* Experiments:&lt;br /&gt;
** try visualizing Leopold Grinberg&#039;s arterial branch dataset (we don&#039;t have easy tool for it right now, but want one!)&lt;br /&gt;
** &amp;lt;&amp;lt; who else on campus has wanted to visualize data but we didn&#039;t have a tool to do it-- use as case study &amp;gt;&amp;gt;&lt;br /&gt;
* Decision:&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=== Software: researcher/developer tools ===&lt;br /&gt;
&lt;br /&gt;
* [[Cave Software Overview]]&lt;br /&gt;
* [[VRG3D Requirements]]&lt;br /&gt;
&lt;br /&gt;
* [[Vis 2009 discussion dfk/dhl/asf]]&lt;br /&gt;
&lt;br /&gt;
== Schedule, Timeline, and Deliverables == &lt;br /&gt;
Assigned to SGF. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
The following describes our schedule, timeline, and&lt;br /&gt;
deliverables using absolute months into the project (months 0-11 is year 1, months 12-23 is year 2, etc.).&lt;br /&gt;
&lt;br /&gt;
=== Upcoming Trip to Californina ===&lt;br /&gt;
*[[Agenda and action items for Disney Imagineering]]&lt;br /&gt;
*[[Agenda and action items for CALLIT2]]&lt;br /&gt;
&lt;br /&gt;
== Year 1 (0.50 hw-person FTE +consulting) ==&lt;br /&gt;
&lt;br /&gt;
We will finalize hardware decisions which will&lt;br /&gt;
involve evaluating changes in availability since proposal submission; demonstrations of competing manufacturer’s&lt;br /&gt;
equipment; consultation regarding details of acquiring, machining, and integrating elements; and&lt;br /&gt;
ordering the central display equipment (projectors, screen material, computers, trackers). The new equipment&lt;br /&gt;
will be received late in the year. Through a process that minimizes system downtime, the 1998 Cave&lt;br /&gt;
will be taken down and removed.&lt;br /&gt;
&lt;br /&gt;
* Acquire test projection system(s) (month 1)&lt;br /&gt;
* Acquire test graphics system(s) (month 1)&lt;br /&gt;
* Acquire test tracking system(s) (month 1)&lt;br /&gt;
* multi-site visit, design discussions, consultent visits (month 1 - month 3)&lt;br /&gt;
* finalize refined design (due month 3, 1.5 hw-person mos)&lt;br /&gt;
* order additional wall/test equipment (month 2)&lt;br /&gt;
* Begin build on test tiled display wall (month 3 - month 6, 1.0 hw-person mo)&lt;br /&gt;
* order Cave equipment (due month 5, 1.0 hw-person mos) screens; projectors;computer parts, racks; computer interconnect; computer-display connections; display-display interconnections; display calibration hardware/software; tracking hardware.&lt;br /&gt;
* receive equipment (due month 8, 0.5 hw-person mos)&lt;br /&gt;
* computer cluster assembled (due month 11, 1 hw-person mo) machine/construct/assemble computer supports; assemble computer hw with high-speed interconnect; install and test OS on cluster&lt;br /&gt;
* raised floor and other site preparations complete (due month 11, 1.0 hw-person mo)&lt;br /&gt;
* Install replacement tile wall, temporary system (month 11)&lt;br /&gt;
* remove 1998 Cave (due at least disruptive time in year 1 TBD, 0.5 hw-person mo)&lt;br /&gt;
&lt;br /&gt;
== Year 2: (0.67 hw-person FTE, 0.58 swe-person FTE)==&lt;br /&gt;
In year 2 we will complete construction of the&lt;br /&gt;
display, bring computer systems online, install TGS’s Avizo and our own VRG3D software, and begin&lt;br /&gt;
testing individual and linked systems.&lt;br /&gt;
* display hardware (due month 20, 4.5 hw-person mos, +machining/fab), (will start in year 1) detailed screen support specifications; detailed monitor support specifications; machine and construct screen supports; machine and construct projector platforms; mount screens and projectors; rough-calibrate projectors&lt;br /&gt;
* display-computer interconnect (due month 20, 0.5 hw-person mo)&lt;br /&gt;
* tracker system(s) (due month 20, 2-4 hw-person mos) install and test; calibrate; create hooks for monitoring and testing&lt;br /&gt;
* VRG3D display software library (due month 23, 6 swe-person mos) source-control setup; ability to distribute software configurable for arbitrary multi-display devices; implemented for new display configuration; multi-display optimizations incorporated; tracking incorporated; hooks for automated testing incorporated&lt;br /&gt;
* install Avizo (due month 23, 1 swe-person mos)&lt;br /&gt;
== Year 3 (0.63 hw-person FTE, 0.63 swe-person FTE) ==&lt;br /&gt;
Monitoring and testing reliability software will be&lt;br /&gt;
designed, developed, and deployed. Application users and developers will be able to begin using the system.&lt;br /&gt;
* VRG3D-based example application (due month 26, 2 swe-person mos) identify additional problems with library&lt;br /&gt;
* distribution version of VRG3D available (due month 30, 1 swe-person mos)&lt;br /&gt;
* application users can now begin creating new applications&lt;br /&gt;
* monitoring/testing reliability software (due month 30, 2 hw-person mos, 4.5 swe-person mos) daily builds of software library and application; daily tests of machine accessibility (tracking, compute cluster functionality/performance, display device availability); touchscreen display of component status/availability; touchscreen access to troubleshooting options; easily extensible touchscreen interface for startup of (experiments, applications, demos, homework assignments) item displayfacet alignment system (due month 35, 5.5 hw-person mos)&lt;br /&gt;
&lt;br /&gt;
== Year 4 (0.17 hw-person FTE, 0.33 swe-person FTE) == &lt;br /&gt;
In year 4 we will finalize the software infrastructure,&lt;br /&gt;
complete the auto-calibration system.&lt;br /&gt;
* software library changes (due month 36, 2 hw-person mos, 3 swe-person mos)&lt;br /&gt;
(note that these are not maintenance, but part of the development process); feature request from&lt;br /&gt;
specific application areas; application users will change apps to use them&lt;br /&gt;
* final software distributions to SourceForge (due month 47, 1 swe-person mos)&lt;/div&gt;</summary>
		<author><name>Sharon King</name></author>
	</entry>
	<entry>
		<id>http://vrl.cs.brown.edu/wiki/index.php?title=Action_Items_for_Sept._29th,_2009&amp;diff=3823</id>
		<title>Action Items for Sept. 29th, 2009</title>
		<link rel="alternate" type="text/html" href="http://vrl.cs.brown.edu/wiki/index.php?title=Action_Items_for_Sept._29th,_2009&amp;diff=3823"/>
		<updated>2009-10-05T20:05:40Z</updated>

		<summary type="html">&lt;p&gt;Sharon King: New page: Due by 10/6  Hardware – Action items update the wiki with hardware issues and send email to dhl when it’s done (John) tracking -  nothing for this yet, as it is a lower priority. It’...&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Due by 10/6&lt;br /&gt;
&lt;br /&gt;
Hardware – Action items&lt;br /&gt;
update the wiki with hardware issues and send email to dhl when it’s done (John)&lt;br /&gt;
tracking -  nothing for this yet, as it is a lower priority. It’s okay to list concerns/issues w/? so we can have a structure in place (John)&lt;br /&gt;
&lt;br /&gt;
Travel plans – Action items&lt;br /&gt;
Date of October 28th has been confirmed. Sam and David need to decide on return time/date. Do we need 2 or 3 days.&lt;br /&gt;
Once this has been decided, we need to confirm date/time with the Disney folks. (DHL/Sam)&lt;br /&gt;
Create separate pages on the wiki for the trip i.e.; Calit and Disney. List agenda items for both. They should be some overlapping. (John)&lt;br /&gt;
&lt;br /&gt;
Project Management – Action Items&lt;br /&gt;
MS project has been installed on Sharon’s machine. John and Sharon have begun to populate sheet. They will continue to work on this and will bring a copy of what they’ve accomplished to the next meeting. (Sharon/John)&lt;br /&gt;
&lt;br /&gt;
Software – Action Items&lt;br /&gt;
Brad and John met this past week to discuss software tools and $G; need further discussions (John/Brad)&lt;br /&gt;
Brad update layer cake on wiki. (DONE)&lt;/div&gt;</summary>
		<author><name>Sharon King</name></author>
	</entry>
	<entry>
		<id>http://vrl.cs.brown.edu/wiki/index.php?title=New_CAVE_Design&amp;diff=3822</id>
		<title>New CAVE Design</title>
		<link rel="alternate" type="text/html" href="http://vrl.cs.brown.edu/wiki/index.php?title=New_CAVE_Design&amp;diff=3822"/>
		<updated>2009-10-05T20:03:42Z</updated>

		<summary type="html">&lt;p&gt;Sharon King: /* Weekly Cave action items */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=Hept-Cave Design Wiki=&lt;br /&gt;
&lt;br /&gt;
This page serves as a repository of the design issues, knowledge, and decisions for the new Brown Cave funded through an NSF grant from 2009-2013.&lt;br /&gt;
&lt;br /&gt;
== Weekly Cave action items ==&lt;br /&gt;
Below is a list of action items for each Cave design meeting.&lt;br /&gt;
* [[Action Items for Sept. 15th, 2009]]&lt;br /&gt;
* [[Action Items for Sept. 22nd, 2009]]&lt;br /&gt;
* [[Action Items for Sept. 29th, 2009]]&lt;br /&gt;
&lt;br /&gt;
== Initial Design Issues ==&lt;br /&gt;
&lt;br /&gt;
=== Display Surface Angles === &lt;br /&gt;
Assigned to DHL. Updates are due by 12:00 noon on 9/14.&lt;br /&gt;
&lt;br /&gt;
* Problem: What are the consequences of display surface angles and/or curvature (horizontal and vertical angles may be different)?&lt;br /&gt;
* Input needed&lt;br /&gt;
** Expert feedback from Acevedo re KAUST design choices&lt;br /&gt;
* Experiments needed&lt;br /&gt;
** Set up two side-by-side and top/bottom displays and evaluate anecdotally&lt;br /&gt;
* Decision: ?&lt;br /&gt;
&lt;br /&gt;
=== Blending/Butting at Display Boundaries ===&lt;br /&gt;
Assigned to SGF. Updates are due on 9/14 by 12:00 noon&lt;br /&gt;
* Problem: What are the consequences of tiling displays together?&lt;br /&gt;
* Input needed&lt;br /&gt;
** Expert feedback from sites with tiled displays like the ones we&#039;ll use (Calit2, Disney, KAUST)&lt;br /&gt;
* Experiments needed&lt;br /&gt;
** Setup 2 displays and report on artifacts at edge between them (color, geometry)&lt;br /&gt;
* Decision: ?&lt;br /&gt;
&lt;br /&gt;
=== Will commodity DLP projection technology work ===&lt;br /&gt;
* Problem: Are commodity DLP projection technologies high-enough quality &amp;amp; reliable for a next-gen Cave?&lt;br /&gt;
* Input needed&lt;br /&gt;
** An understanding of how much effort Mark Mine et al. at Disney have put in&lt;br /&gt;
** What is Mark&#039;s estimate on how much more time/effort it will take to have a high-quality display&lt;br /&gt;
** standard desktop text does not look good on Mitsubishi HDTVs.  Is that a &amp;quot;show stopper&amp;quot;?&lt;br /&gt;
** Why is a projector-based system worse than HDTV approach?&lt;br /&gt;
* Experiments needed&lt;br /&gt;
** ?&lt;br /&gt;
* Decision: ?&lt;br /&gt;
&lt;br /&gt;
=== Text with Checkerboard Stereo === &lt;br /&gt;
Assigned to JH. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
* Problem: What text resolution will be usable with checkerboard stereo and will that level be sufficient to do the experiments and applications that we want to do?&lt;br /&gt;
* Input needed&lt;br /&gt;
** Expert feedback from sites already experimenting with the displays we&#039;ll use (Calit2, Disney, KAUST)&lt;br /&gt;
* Experiments needed&lt;br /&gt;
** Compare visual angle of smallest comfortable text on desktop display versus on checkerboard stereo display.&lt;br /&gt;
* Decision: ?&lt;br /&gt;
&lt;br /&gt;
=== Floor Design === Assigned to SGF.&lt;br /&gt;
Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
=== Treadmill Options === &lt;br /&gt;
( not Omni-directional) Assigned to SGF. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
=== Fixed wall design, or can it unfold into a powerwall? === &lt;br /&gt;
Assigned to SGF.  Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
=== Ceiling Value, and Design Options === &lt;br /&gt;
Assigned to SGF. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
=== Contracting to an Integrator === &lt;br /&gt;
Assigned to SGF.  Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
* Problem: Would contracting to an integrator to build based on an RFP be effective?&lt;br /&gt;
* Input:&lt;br /&gt;
** Phone feedback from some of the potential integrators&lt;br /&gt;
* Decision:&lt;br /&gt;
&lt;br /&gt;
=== [[3D Tracking options]] === &lt;br /&gt;
Assigned to JH. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
* Problem: Would camera-based tracking be a value or time-sink for the Cave?&lt;br /&gt;
* Input:&lt;br /&gt;
** Talk with people using camera-based tracking (Calit2, Disney, KAUST, Lit3D, Iowa State, UNC?, ..)&lt;br /&gt;
* Experiments needed:&lt;br /&gt;
** Try first hand most promising camera-based tracking and document:&lt;br /&gt;
*** the degree to which it is: wireless, accurate, low-latency, unobtrusive&lt;br /&gt;
*** the degree to which it provides: head-tracking, wand-tracking, tracking of fingers/feet/body, tracking of &amp;quot;phicons&amp;quot;/props&lt;br /&gt;
* Decision: ?&lt;br /&gt;
&lt;br /&gt;
=== Hardware supporting usability studies === &lt;br /&gt;
Assigned to ASF. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
* Problem: is special hardware needed to support evaluation of Cave-like systems (e.g., devices that measure galvanic skin response (GSR))?&lt;br /&gt;
* Input needed&lt;br /&gt;
** Advice from Mel Slater (How does Mel decide when GSR, etc. is important?  How expensive is the system?)&lt;br /&gt;
** Mel says, &amp;quot;[we use] a device called Nexus 4, which has skin conductance, ECG, respiration, and can also be used for EMG and EEG. I think that it is of the order of 10K or less depending on how many channels are used.&amp;quot;.&lt;br /&gt;
** Consider whether results from future (or past) studies would be significantly improved with such devices?&lt;br /&gt;
*** asf thoughts (may be wrong!): GSR helps detects changes in a person&#039;s &amp;quot;comfort&amp;quot;-- this might reflect the level of frustration or happiness while evaluating some user interaction or visualization method that the person doesn&#039;t verbalize; that may be useful additional information for formal studies.  PTSD studies would benefit from the information, I should think.  However, if the device requires stringing wires all around, it might cause subjects to behave differently which would be bad.&lt;br /&gt;
* Experiments needed&lt;br /&gt;
** none&lt;br /&gt;
* Decision: ?&lt;br /&gt;
&lt;br /&gt;
=== Commercial Software Availability === &lt;br /&gt;
Assigned to JH. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
* Problem: What do we need to do to make sure that commercial software will be usable in our new facility?&lt;br /&gt;
* Input:&lt;br /&gt;
** Feedback from some of the software players (Avizo/Amira, Ensight, OpenSceneGraph)&lt;br /&gt;
* Experiments:&lt;br /&gt;
** try visualizing Leopold Grinberg&#039;s arterial branch dataset (we don&#039;t have easy tool for it right now, but want one!)&lt;br /&gt;
** &amp;lt;&amp;lt; who else on campus has wanted to visualize data but we didn&#039;t have a tool to do it-- use as case study &amp;gt;&amp;gt;&lt;br /&gt;
* Decision:&lt;br /&gt;
&lt;br /&gt;
== Schedule, Timeline, and Deliverables == &lt;br /&gt;
Assigned to SGF. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
The following describes our schedule, timeline, and&lt;br /&gt;
deliverables using absolute months into the project (months 0-11 is year 1, months 12-23 is year 2, etc.).&lt;br /&gt;
&lt;br /&gt;
[[Cave Software Overview]]&lt;br /&gt;
&lt;br /&gt;
== Year 1 (0.50 hw-person FTE +consulting) ==&lt;br /&gt;
&lt;br /&gt;
We will finalize hardware decisions which will&lt;br /&gt;
involve evaluating changes in availability since proposal submission; demonstrations of competing manufacturer’s&lt;br /&gt;
equipment; consultation regarding details of acquiring, machining, and integrating elements; and&lt;br /&gt;
ordering the central display equipment (projectors, screen material, computers, trackers). The new equipment&lt;br /&gt;
will be received late in the year. Through a process that minimizes system downtime, the 1998 Cave&lt;br /&gt;
will be taken down and removed.&lt;br /&gt;
&lt;br /&gt;
* Acquire test projection system(s) (month 1)&lt;br /&gt;
* Acquire test graphics system(s) (month 1)&lt;br /&gt;
* Acquire test tracking system(s) (month 1)&lt;br /&gt;
* multi-site visit, design discussions, consultent visits (month 1 - month 3)&lt;br /&gt;
* finalize refined design (due month 3, 1.5 hw-person mos)&lt;br /&gt;
* order additional wall/test equipment (month 2)&lt;br /&gt;
* Begin build on test tiled display wall (month 3 - month 6, 1.0 hw-person mo)&lt;br /&gt;
* order Cave equipment (due month 5, 1.0 hw-person mos) screens; projectors;computer parts, racks; computer interconnect; computer-display connections; display-display interconnections; display calibration hardware/software; tracking hardware.&lt;br /&gt;
* receive equipment (due month 8, 0.5 hw-person mos)&lt;br /&gt;
* computer cluster assembled (due month 11, 1 hw-person mo) machine/construct/assemble computer supports; assemble computer hw with high-speed interconnect; install and test OS on cluster&lt;br /&gt;
* raised floor and other site preparations complete (due month 11, 1.0 hw-person mo)&lt;br /&gt;
* Install replacement tile wall, temporary system (month 11)&lt;br /&gt;
* remove 1998 Cave (due at least disruptive time in year 1 TBD, 0.5 hw-person mo)&lt;br /&gt;
&lt;br /&gt;
== Year 2: (0.67 hw-person FTE, 0.58 swe-person FTE)==&lt;br /&gt;
In year 2 we will complete construction of the&lt;br /&gt;
display, bring computer systems online, install TGS’s Avizo and our own VRG3D software, and begin&lt;br /&gt;
testing individual and linked systems.&lt;br /&gt;
* display hardware (due month 20, 4.5 hw-person mos, +machining/fab), (will start in year 1) detailed screen support specifications; detailed monitor support specifications; machine and construct screen supports; machine and construct projector platforms; mount screens and projectors; rough-calibrate projectors&lt;br /&gt;
* display-computer interconnect (due month 20, 0.5 hw-person mo)&lt;br /&gt;
* tracker system(s) (due month 20, 2-4 hw-person mos) install and test; calibrate; create hooks for monitoring and testing&lt;br /&gt;
* VRG3D display software library (due month 23, 6 swe-person mos) source-control setup; ability to distribute software configurable for arbitrary multi-display devices; implemented for new display configuration; multi-display optimizations incorporated; tracking incorporated; hooks for automated testing incorporated&lt;br /&gt;
* install Avizo (due month 23, 1 swe-person mos)&lt;br /&gt;
== Year 3 (0.63 hw-person FTE, 0.63 swe-person FTE) ==&lt;br /&gt;
Monitoring and testing reliability software will be&lt;br /&gt;
designed, developed, and deployed. Application users and developers will be able to begin using the system.&lt;br /&gt;
* VRG3D-based example application (due month 26, 2 swe-person mos) identify additional problems with library&lt;br /&gt;
* distribution version of VRG3D available (due month 30, 1 swe-person mos)&lt;br /&gt;
* application users can now begin creating new applications&lt;br /&gt;
* monitoring/testing reliability software (due month 30, 2 hw-person mos, 4.5 swe-person mos) daily builds of software library and application; daily tests of machine accessibility (tracking, compute cluster functionality/performance, display device availability); touchscreen display of component status/availability; touchscreen access to troubleshooting options; easily extensible touchscreen interface for startup of (experiments, applications, demos, homework assignments) item displayfacet alignment system (due month 35, 5.5 hw-person mos)&lt;br /&gt;
&lt;br /&gt;
== Year 4 (0.17 hw-person FTE, 0.33 swe-person FTE) == &lt;br /&gt;
In year 4 we will finalize the software infrastructure,&lt;br /&gt;
complete the auto-calibration system.&lt;br /&gt;
* software library changes (due month 36, 2 hw-person mos, 3 swe-person mos)&lt;br /&gt;
(note that these are not maintenance, but part of the development process); feature request from&lt;br /&gt;
specific application areas; application users will change apps to use them&lt;br /&gt;
* final software distributions to SourceForge (due month 47, 1 swe-person mos)&lt;/div&gt;</summary>
		<author><name>Sharon King</name></author>
	</entry>
	<entry>
		<id>http://vrl.cs.brown.edu/wiki/index.php?title=New_CAVE_Design&amp;diff=3821</id>
		<title>New CAVE Design</title>
		<link rel="alternate" type="text/html" href="http://vrl.cs.brown.edu/wiki/index.php?title=New_CAVE_Design&amp;diff=3821"/>
		<updated>2009-10-05T20:02:10Z</updated>

		<summary type="html">&lt;p&gt;Sharon King: /* Weekly Cave action items */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=Hept-Cave Design Wiki=&lt;br /&gt;
&lt;br /&gt;
This page serves as a repository of the design issues, knowledge, and decisions for the new Brown Cave funded through an NSF grant from 2009-2013.&lt;br /&gt;
&lt;br /&gt;
== Weekly Cave action items ==&lt;br /&gt;
Below is a list of action items for each Cave design meeting.&lt;br /&gt;
* [[Action Items for Sept. 15th, 2009]]&lt;br /&gt;
* [[Action Items for Sept. 22nd, 2009]]&lt;br /&gt;
* ((Action Items for September 29, 2009))&lt;br /&gt;
&lt;br /&gt;
== Initial Design Issues ==&lt;br /&gt;
&lt;br /&gt;
=== Display Surface Angles === &lt;br /&gt;
Assigned to DHL. Updates are due by 12:00 noon on 9/14.&lt;br /&gt;
&lt;br /&gt;
* Problem: What are the consequences of display surface angles and/or curvature (horizontal and vertical angles may be different)?&lt;br /&gt;
* Input needed&lt;br /&gt;
** Expert feedback from Acevedo re KAUST design choices&lt;br /&gt;
* Experiments needed&lt;br /&gt;
** Set up two side-by-side and top/bottom displays and evaluate anecdotally&lt;br /&gt;
* Decision: ?&lt;br /&gt;
&lt;br /&gt;
=== Blending/Butting at Display Boundaries ===&lt;br /&gt;
Assigned to SGF. Updates are due on 9/14 by 12:00 noon&lt;br /&gt;
* Problem: What are the consequences of tiling displays together?&lt;br /&gt;
* Input needed&lt;br /&gt;
** Expert feedback from sites with tiled displays like the ones we&#039;ll use (Calit2, Disney, KAUST)&lt;br /&gt;
* Experiments needed&lt;br /&gt;
** Setup 2 displays and report on artifacts at edge between them (color, geometry)&lt;br /&gt;
* Decision: ?&lt;br /&gt;
&lt;br /&gt;
=== Will commodity DLP projection technology work ===&lt;br /&gt;
* Problem: Are commodity DLP projection technologies high-enough quality &amp;amp; reliable for a next-gen Cave?&lt;br /&gt;
* Input needed&lt;br /&gt;
** An understanding of how much effort Mark Mine et al. at Disney have put in&lt;br /&gt;
** What is Mark&#039;s estimate on how much more time/effort it will take to have a high-quality display&lt;br /&gt;
** standard desktop text does not look good on Mitsubishi HDTVs.  Is that a &amp;quot;show stopper&amp;quot;?&lt;br /&gt;
** Why is a projector-based system worse than HDTV approach?&lt;br /&gt;
* Experiments needed&lt;br /&gt;
** ?&lt;br /&gt;
* Decision: ?&lt;br /&gt;
&lt;br /&gt;
=== Text with Checkerboard Stereo === &lt;br /&gt;
Assigned to JH. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
* Problem: What text resolution will be usable with checkerboard stereo and will that level be sufficient to do the experiments and applications that we want to do?&lt;br /&gt;
* Input needed&lt;br /&gt;
** Expert feedback from sites already experimenting with the displays we&#039;ll use (Calit2, Disney, KAUST)&lt;br /&gt;
* Experiments needed&lt;br /&gt;
** Compare visual angle of smallest comfortable text on desktop display versus on checkerboard stereo display.&lt;br /&gt;
* Decision: ?&lt;br /&gt;
&lt;br /&gt;
=== Floor Design === Assigned to SGF.&lt;br /&gt;
Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
=== Treadmill Options === &lt;br /&gt;
( not Omni-directional) Assigned to SGF. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
=== Fixed wall design, or can it unfold into a powerwall? === &lt;br /&gt;
Assigned to SGF.  Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
=== Ceiling Value, and Design Options === &lt;br /&gt;
Assigned to SGF. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
=== Contracting to an Integrator === &lt;br /&gt;
Assigned to SGF.  Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
* Problem: Would contracting to an integrator to build based on an RFP be effective?&lt;br /&gt;
* Input:&lt;br /&gt;
** Phone feedback from some of the potential integrators&lt;br /&gt;
* Decision:&lt;br /&gt;
&lt;br /&gt;
=== [[3D Tracking options]] === &lt;br /&gt;
Assigned to JH. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
* Problem: Would camera-based tracking be a value or time-sink for the Cave?&lt;br /&gt;
* Input:&lt;br /&gt;
** Talk with people using camera-based tracking (Calit2, Disney, KAUST, Lit3D, Iowa State, UNC?, ..)&lt;br /&gt;
* Experiments needed:&lt;br /&gt;
** Try first hand most promising camera-based tracking and document:&lt;br /&gt;
*** the degree to which it is: wireless, accurate, low-latency, unobtrusive&lt;br /&gt;
*** the degree to which it provides: head-tracking, wand-tracking, tracking of fingers/feet/body, tracking of &amp;quot;phicons&amp;quot;/props&lt;br /&gt;
* Decision: ?&lt;br /&gt;
&lt;br /&gt;
=== Hardware supporting usability studies === &lt;br /&gt;
Assigned to ASF. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
* Problem: is special hardware needed to support evaluation of Cave-like systems (e.g., devices that measure galvanic skin response (GSR))?&lt;br /&gt;
* Input needed&lt;br /&gt;
** Advice from Mel Slater (How does Mel decide when GSR, etc. is important?  How expensive is the system?)&lt;br /&gt;
** Mel says, &amp;quot;[we use] a device called Nexus 4, which has skin conductance, ECG, respiration, and can also be used for EMG and EEG. I think that it is of the order of 10K or less depending on how many channels are used.&amp;quot;.&lt;br /&gt;
** Consider whether results from future (or past) studies would be significantly improved with such devices?&lt;br /&gt;
*** asf thoughts (may be wrong!): GSR helps detects changes in a person&#039;s &amp;quot;comfort&amp;quot;-- this might reflect the level of frustration or happiness while evaluating some user interaction or visualization method that the person doesn&#039;t verbalize; that may be useful additional information for formal studies.  PTSD studies would benefit from the information, I should think.  However, if the device requires stringing wires all around, it might cause subjects to behave differently which would be bad.&lt;br /&gt;
* Experiments needed&lt;br /&gt;
** none&lt;br /&gt;
* Decision: ?&lt;br /&gt;
&lt;br /&gt;
=== Commercial Software Availability === &lt;br /&gt;
Assigned to JH. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
* Problem: What do we need to do to make sure that commercial software will be usable in our new facility?&lt;br /&gt;
* Input:&lt;br /&gt;
** Feedback from some of the software players (Avizo/Amira, Ensight, OpenSceneGraph)&lt;br /&gt;
* Experiments:&lt;br /&gt;
** try visualizing Leopold Grinberg&#039;s arterial branch dataset (we don&#039;t have easy tool for it right now, but want one!)&lt;br /&gt;
** &amp;lt;&amp;lt; who else on campus has wanted to visualize data but we didn&#039;t have a tool to do it-- use as case study &amp;gt;&amp;gt;&lt;br /&gt;
* Decision:&lt;br /&gt;
&lt;br /&gt;
== Schedule, Timeline, and Deliverables == &lt;br /&gt;
Assigned to SGF. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
The following describes our schedule, timeline, and&lt;br /&gt;
deliverables using absolute months into the project (months 0-11 is year 1, months 12-23 is year 2, etc.).&lt;br /&gt;
&lt;br /&gt;
[[Cave Software Overview]]&lt;br /&gt;
&lt;br /&gt;
== Year 1 (0.50 hw-person FTE +consulting) ==&lt;br /&gt;
&lt;br /&gt;
We will finalize hardware decisions which will&lt;br /&gt;
involve evaluating changes in availability since proposal submission; demonstrations of competing manufacturer’s&lt;br /&gt;
equipment; consultation regarding details of acquiring, machining, and integrating elements; and&lt;br /&gt;
ordering the central display equipment (projectors, screen material, computers, trackers). The new equipment&lt;br /&gt;
will be received late in the year. Through a process that minimizes system downtime, the 1998 Cave&lt;br /&gt;
will be taken down and removed.&lt;br /&gt;
&lt;br /&gt;
* Acquire test projection system(s) (month 1)&lt;br /&gt;
* Acquire test graphics system(s) (month 1)&lt;br /&gt;
* Acquire test tracking system(s) (month 1)&lt;br /&gt;
* multi-site visit, design discussions, consultent visits (month 1 - month 3)&lt;br /&gt;
* finalize refined design (due month 3, 1.5 hw-person mos)&lt;br /&gt;
* order additional wall/test equipment (month 2)&lt;br /&gt;
* Begin build on test tiled display wall (month 3 - month 6, 1.0 hw-person mo)&lt;br /&gt;
* order Cave equipment (due month 5, 1.0 hw-person mos) screens; projectors;computer parts, racks; computer interconnect; computer-display connections; display-display interconnections; display calibration hardware/software; tracking hardware.&lt;br /&gt;
* receive equipment (due month 8, 0.5 hw-person mos)&lt;br /&gt;
* computer cluster assembled (due month 11, 1 hw-person mo) machine/construct/assemble computer supports; assemble computer hw with high-speed interconnect; install and test OS on cluster&lt;br /&gt;
* raised floor and other site preparations complete (due month 11, 1.0 hw-person mo)&lt;br /&gt;
* Install replacement tile wall, temporary system (month 11)&lt;br /&gt;
* remove 1998 Cave (due at least disruptive time in year 1 TBD, 0.5 hw-person mo)&lt;br /&gt;
&lt;br /&gt;
== Year 2: (0.67 hw-person FTE, 0.58 swe-person FTE)==&lt;br /&gt;
In year 2 we will complete construction of the&lt;br /&gt;
display, bring computer systems online, install TGS’s Avizo and our own VRG3D software, and begin&lt;br /&gt;
testing individual and linked systems.&lt;br /&gt;
* display hardware (due month 20, 4.5 hw-person mos, +machining/fab), (will start in year 1) detailed screen support specifications; detailed monitor support specifications; machine and construct screen supports; machine and construct projector platforms; mount screens and projectors; rough-calibrate projectors&lt;br /&gt;
* display-computer interconnect (due month 20, 0.5 hw-person mo)&lt;br /&gt;
* tracker system(s) (due month 20, 2-4 hw-person mos) install and test; calibrate; create hooks for monitoring and testing&lt;br /&gt;
* VRG3D display software library (due month 23, 6 swe-person mos) source-control setup; ability to distribute software configurable for arbitrary multi-display devices; implemented for new display configuration; multi-display optimizations incorporated; tracking incorporated; hooks for automated testing incorporated&lt;br /&gt;
* install Avizo (due month 23, 1 swe-person mos)&lt;br /&gt;
== Year 3 (0.63 hw-person FTE, 0.63 swe-person FTE) ==&lt;br /&gt;
Monitoring and testing reliability software will be&lt;br /&gt;
designed, developed, and deployed. Application users and developers will be able to begin using the system.&lt;br /&gt;
* VRG3D-based example application (due month 26, 2 swe-person mos) identify additional problems with library&lt;br /&gt;
* distribution version of VRG3D available (due month 30, 1 swe-person mos)&lt;br /&gt;
* application users can now begin creating new applications&lt;br /&gt;
* monitoring/testing reliability software (due month 30, 2 hw-person mos, 4.5 swe-person mos) daily builds of software library and application; daily tests of machine accessibility (tracking, compute cluster functionality/performance, display device availability); touchscreen display of component status/availability; touchscreen access to troubleshooting options; easily extensible touchscreen interface for startup of (experiments, applications, demos, homework assignments) item displayfacet alignment system (due month 35, 5.5 hw-person mos)&lt;br /&gt;
&lt;br /&gt;
== Year 4 (0.17 hw-person FTE, 0.33 swe-person FTE) == &lt;br /&gt;
In year 4 we will finalize the software infrastructure,&lt;br /&gt;
complete the auto-calibration system.&lt;br /&gt;
* software library changes (due month 36, 2 hw-person mos, 3 swe-person mos)&lt;br /&gt;
(note that these are not maintenance, but part of the development process); feature request from&lt;br /&gt;
specific application areas; application users will change apps to use them&lt;br /&gt;
* final software distributions to SourceForge (due month 47, 1 swe-person mos)&lt;/div&gt;</summary>
		<author><name>Sharon King</name></author>
	</entry>
	<entry>
		<id>http://vrl.cs.brown.edu/wiki/index.php?title=Action_Items_for_Sept._22nd,_2009&amp;diff=3804</id>
		<title>Action Items for Sept. 22nd, 2009</title>
		<link rel="alternate" type="text/html" href="http://vrl.cs.brown.edu/wiki/index.php?title=Action_Items_for_Sept._22nd,_2009&amp;diff=3804"/>
		<updated>2009-09-24T19:23:50Z</updated>

		<summary type="html">&lt;p&gt;Sharon King: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Hardware - new issue &lt;br /&gt;
* Mitsubishi laservue 3D mode gets ghosting (John update) due by Tuesday, 9/29&lt;br /&gt;
* Display contender shootout comparison table (John) due by Tuesday, 9/29   Mitshubishi is not as impressive as hoped for, good   black level, very thin&lt;br /&gt;
* Tracking contender shootout comparison table (John) due by Tuesday, 9/29&lt;br /&gt;
new issues from discussion with Mark (imagineering)&lt;br /&gt;
* Samsung - all color correction goes away with 3D and may be fixable (John) due by Tuesday, 9/29&lt;br /&gt;
signals for each visit and visitor e.g. Mel: person-monitoring stuff; e.g. starcave, angle stuff&lt;br /&gt;
* Travel/visit planning - need action items for these (Sam) due by Tuesday, 9/29&lt;br /&gt;
* Travel to starcave (san diego), and imaineering (glendale/burbank) (Sharon) due by Tuesday, 9/29&lt;br /&gt;
* Project Management software initial setup: (John/Sharon) due by Tuesday, 9/29&lt;br /&gt;
&lt;br /&gt;
DONE: G3D and VRG3D layer cake : Brad&lt;br /&gt;
* one more iteration, (Brad and John) due by Tuesday, 9/29&lt;/div&gt;</summary>
		<author><name>Sharon King</name></author>
	</entry>
	<entry>
		<id>http://vrl.cs.brown.edu/wiki/index.php?title=Action_Items_for_Sept._22nd,_2009&amp;diff=3803</id>
		<title>Action Items for Sept. 22nd, 2009</title>
		<link rel="alternate" type="text/html" href="http://vrl.cs.brown.edu/wiki/index.php?title=Action_Items_for_Sept._22nd,_2009&amp;diff=3803"/>
		<updated>2009-09-24T18:00:28Z</updated>

		<summary type="html">&lt;p&gt;Sharon King: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Hardware - new issue &lt;br /&gt;
* Mitsubishi laservue 3D mode gets ghosting (John update) due by Tuesday, 9/29&lt;br /&gt;
* Display contender shootout comparison table (John) due by Tuesday, 9/29   Mitshubishi is not as impressive as hoped for, good    black level, very thin&lt;br /&gt;
* Tracking contender shootout comparison table (John) due by Tuesday, 9/29&lt;/div&gt;</summary>
		<author><name>Sharon King</name></author>
	</entry>
	<entry>
		<id>http://vrl.cs.brown.edu/wiki/index.php?title=New_CAVE_Design&amp;diff=3802</id>
		<title>New CAVE Design</title>
		<link rel="alternate" type="text/html" href="http://vrl.cs.brown.edu/wiki/index.php?title=New_CAVE_Design&amp;diff=3802"/>
		<updated>2009-09-24T17:17:36Z</updated>

		<summary type="html">&lt;p&gt;Sharon King: /* Weekly Cave action items */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=Hept-Cave Design Wiki=&lt;br /&gt;
&lt;br /&gt;
This page serves as a repository of the design issues, knowledge, and decisions for the new Brown Cave funded through an NSF grant from 2009-2013.&lt;br /&gt;
&lt;br /&gt;
== Weekly Cave action items ==&lt;br /&gt;
Below is a list of action items for each Cave design meeting.&lt;br /&gt;
* [[Action Items for Sept. 15th, 2009]]&lt;br /&gt;
* [[Action Items for Sept. 22nd, 2009]]&lt;br /&gt;
&lt;br /&gt;
== Initial Design Issues ==&lt;br /&gt;
&lt;br /&gt;
=== Display Surface Angles === &lt;br /&gt;
Assigned to DHL. Updates are due by 12:00 noon on 9/14.&lt;br /&gt;
&lt;br /&gt;
* Problem: What are the consequences of display surface angles and/or curvature (horizontal and vertical angles may be different)?&lt;br /&gt;
* Input needed&lt;br /&gt;
** Expert feedback from Acevedo re KAUST design choices&lt;br /&gt;
* Experiments needed&lt;br /&gt;
** Set up two side-by-side and top/bottom displays and evaluate anecdotally&lt;br /&gt;
* Decision: ?&lt;br /&gt;
&lt;br /&gt;
=== Blending/Butting at Display Boundaries ===&lt;br /&gt;
Assigned to SGF. Updates are due on 9/14 by 12:00 noon&lt;br /&gt;
* Problem: What are the consequences of tiling displays together?&lt;br /&gt;
* Input needed&lt;br /&gt;
** Expert feedback from sites with tiled displays like the ones we&#039;ll use (Calit2, Disney, KAUST)&lt;br /&gt;
* Experiments needed&lt;br /&gt;
** Setup 2 displays and report on artifacts at edge between them (color, geometry)&lt;br /&gt;
* Decision: ?&lt;br /&gt;
&lt;br /&gt;
=== Will commodity DLP projection technology work ===&lt;br /&gt;
* Problem: Are commodity DLP projection technologies high-enough quality &amp;amp; reliable for a next-gen Cave?&lt;br /&gt;
* Input needed&lt;br /&gt;
** An understanding of how much effort Mark Mine et al. at Disney have put in&lt;br /&gt;
** What is Mark&#039;s estimate on how much more time/effort it will take to have a high-quality display&lt;br /&gt;
** standard desktop text does not look good on Mitsubishi HDTVs.  Is that a &amp;quot;show stopper&amp;quot;?&lt;br /&gt;
** Why is a projector-based system worse than HDTV approach?&lt;br /&gt;
* Experiments needed&lt;br /&gt;
** ?&lt;br /&gt;
* Decision: ?&lt;br /&gt;
&lt;br /&gt;
=== Text with Checkerboard Stereo === &lt;br /&gt;
Assigned to JH. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
* Problem: What text resolution will be usable with checkerboard stereo and will that level be sufficient to do the experiments and applications that we want to do?&lt;br /&gt;
* Input needed&lt;br /&gt;
** Expert feedback from sites already experimenting with the displays we&#039;ll use (Calit2, Disney, KAUST)&lt;br /&gt;
* Experiments needed&lt;br /&gt;
** Compare visual angle of smallest comfortable text on desktop display versus on checkerboard stereo display.&lt;br /&gt;
* Decision: ?&lt;br /&gt;
&lt;br /&gt;
=== Floor Design === Assigned to SGF.&lt;br /&gt;
Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
=== Treadmill Options === &lt;br /&gt;
( not Omni-directional) Assigned to SGF. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
=== Fixed wall design, or can it unfold into a powerwall? === &lt;br /&gt;
Assigned to SGF.  Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
=== Ceiling Value, and Design Options === &lt;br /&gt;
Assigned to SGF. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
=== Contracting to an Integrator === &lt;br /&gt;
Assigned to SGF.  Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
* Problem: Would contracting to an integrator to build based on an RFP be effective?&lt;br /&gt;
* Input:&lt;br /&gt;
** Phone feedback from some of the potential integrators&lt;br /&gt;
* Decision:&lt;br /&gt;
&lt;br /&gt;
=== [[3D Tracking options]] === &lt;br /&gt;
Assigned to JH. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
* Problem: Would camera-based tracking be a value or time-sink for the Cave?&lt;br /&gt;
* Input:&lt;br /&gt;
** Talk with people using camera-based tracking (Calit2, Disney, KAUST, Lit3D, Iowa State, UNC?, ..)&lt;br /&gt;
* Experiments needed:&lt;br /&gt;
** Try first hand most promising camera-based tracking and document:&lt;br /&gt;
*** the degree to which it is: wireless, accurate, low-latency, unobtrusive&lt;br /&gt;
*** the degree to which it provides: head-tracking, wand-tracking, tracking of fingers/feet/body, tracking of &amp;quot;phicons&amp;quot;/props&lt;br /&gt;
* Decision: ?&lt;br /&gt;
&lt;br /&gt;
=== Hardware supporting usability studies === &lt;br /&gt;
Assigned to ASF. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
* Problem: is special hardware needed to support evaluation of Cave-like systems (e.g., devices that measure galvanic skin response (GSR))?&lt;br /&gt;
* Input needed&lt;br /&gt;
** Advice from Mel Slater (How does Mel decide when GSR, etc. is important?  How expensive is the system?)&lt;br /&gt;
** Mel says, &amp;quot;[we use] a device called Nexus 4, which has skin conductance, ECG, respiration, and can also be used for EMG and EEG. I think that it is of the order of 10K or less depending on how many channels are used.&amp;quot;.&lt;br /&gt;
** Consider whether results from future (or past) studies would be significantly improved with such devices?&lt;br /&gt;
*** asf thoughts (may be wrong!): GSR helps detects changes in a person&#039;s &amp;quot;comfort&amp;quot;-- this might reflect the level of frustration or happiness while evaluating some user interaction or visualization method that the person doesn&#039;t verbalize; that may be useful additional information for formal studies.  PTSD studies would benefit from the information, I should think.  However, if the device requires stringing wires all around, it might cause subjects to behave differently which would be bad.&lt;br /&gt;
* Experiments needed&lt;br /&gt;
** none&lt;br /&gt;
* Decision: ?&lt;br /&gt;
&lt;br /&gt;
=== Commercial Software Availability === &lt;br /&gt;
Assigned to JH. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
* Problem: What do we need to do to make sure that commercial software will be usable in our new facility?&lt;br /&gt;
* Input:&lt;br /&gt;
** Feedback from some of the software players (Avizo/Amira, Ensight, OpenSceneGraph)&lt;br /&gt;
* Experiments:&lt;br /&gt;
** try visualizing Leopold Grinberg&#039;s arterial branch dataset (we don&#039;t have easy tool for it right now, but want one!)&lt;br /&gt;
** &amp;lt;&amp;lt; who else on campus has wanted to visualize data but we didn&#039;t have a tool to do it-- use as case study &amp;gt;&amp;gt;&lt;br /&gt;
* Decision:&lt;br /&gt;
&lt;br /&gt;
== Schedule, Timeline, and Deliverables == &lt;br /&gt;
Assigned to SGF. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
The following describes our schedule, timeline, and&lt;br /&gt;
deliverables using absolute months into the project (months 0-11 is year 1, months 12-23 is year 2, etc.).&lt;br /&gt;
&lt;br /&gt;
[[Cave Software Overview]]&lt;br /&gt;
&lt;br /&gt;
== Year 1 (0.50 hw-person FTE +consulting) ==&lt;br /&gt;
&lt;br /&gt;
We will finalize hardware decisions which will&lt;br /&gt;
involve evaluating changes in availability since proposal submission; demonstrations of competing manufacturer’s&lt;br /&gt;
equipment; consultation regarding details of acquiring, machining, and integrating elements; and&lt;br /&gt;
ordering the central display equipment (projectors, screen material, computers, trackers). The new equipment&lt;br /&gt;
will be received late in the year. Through a process that minimizes system downtime, the 1998 Cave&lt;br /&gt;
will be taken down and removed.&lt;br /&gt;
&lt;br /&gt;
* Acquire test projection system(s) (month 1)&lt;br /&gt;
* Acquire test graphics system(s) (month 1)&lt;br /&gt;
* Acquire test tracking system(s) (month 1)&lt;br /&gt;
* multi-site visit, design discussions, consultent visits (month 1 - month 3)&lt;br /&gt;
* finalize refined design (due month 3, 1.5 hw-person mos)&lt;br /&gt;
* order additional wall/test equipment (month 2)&lt;br /&gt;
* Begin build on test tiled display wall (month 3 - month 6, 1.0 hw-person mo)&lt;br /&gt;
* order Cave equipment (due month 5, 1.0 hw-person mos) screens; projectors;computer parts, racks; computer interconnect; computer-display connections; display-display interconnections; display calibration hardware/software; tracking hardware.&lt;br /&gt;
* receive equipment (due month 8, 0.5 hw-person mos)&lt;br /&gt;
* computer cluster assembled (due month 11, 1 hw-person mo) machine/construct/assemble computer supports; assemble computer hw with high-speed interconnect; install and test OS on cluster&lt;br /&gt;
* raised floor and other site preparations complete (due month 11, 1.0 hw-person mo)&lt;br /&gt;
* Install replacement tile wall, temporary system (month 11)&lt;br /&gt;
* remove 1998 Cave (due at least disruptive time in year 1 TBD, 0.5 hw-person mo)&lt;br /&gt;
&lt;br /&gt;
== Year 2: (0.67 hw-person FTE, 0.58 swe-person FTE)==&lt;br /&gt;
In year 2 we will complete construction of the&lt;br /&gt;
display, bring computer systems online, install TGS’s Avizo and our own VRG3D software, and begin&lt;br /&gt;
testing individual and linked systems.&lt;br /&gt;
* display hardware (due month 20, 4.5 hw-person mos, +machining/fab), (will start in year 1) detailed screen support specifications; detailed monitor support specifications; machine and construct screen supports; machine and construct projector platforms; mount screens and projectors; rough-calibrate projectors&lt;br /&gt;
* display-computer interconnect (due month 20, 0.5 hw-person mo)&lt;br /&gt;
* tracker system(s) (due month 20, 2-4 hw-person mos) install and test; calibrate; create hooks for monitoring and testing&lt;br /&gt;
* VRG3D display software library (due month 23, 6 swe-person mos) source-control setup; ability to distribute software configurable for arbitrary multi-display devices; implemented for new display configuration; multi-display optimizations incorporated; tracking incorporated; hooks for automated testing incorporated&lt;br /&gt;
* install Avizo (due month 23, 1 swe-person mos)&lt;br /&gt;
== Year 3 (0.63 hw-person FTE, 0.63 swe-person FTE) ==&lt;br /&gt;
Monitoring and testing reliability software will be&lt;br /&gt;
designed, developed, and deployed. Application users and developers will be able to begin using the system.&lt;br /&gt;
* VRG3D-based example application (due month 26, 2 swe-person mos) identify additional problems with library&lt;br /&gt;
* distribution version of VRG3D available (due month 30, 1 swe-person mos)&lt;br /&gt;
* application users can now begin creating new applications&lt;br /&gt;
* monitoring/testing reliability software (due month 30, 2 hw-person mos, 4.5 swe-person mos) daily builds of software library and application; daily tests of machine accessibility (tracking, compute cluster functionality/performance, display device availability); touchscreen display of component status/availability; touchscreen access to troubleshooting options; easily extensible touchscreen interface for startup of (experiments, applications, demos, homework assignments) item displayfacet alignment system (due month 35, 5.5 hw-person mos)&lt;br /&gt;
&lt;br /&gt;
== Year 4 (0.17 hw-person FTE, 0.33 swe-person FTE) == &lt;br /&gt;
In year 4 we will finalize the software infrastructure,&lt;br /&gt;
complete the auto-calibration system.&lt;br /&gt;
* software library changes (due month 36, 2 hw-person mos, 3 swe-person mos)&lt;br /&gt;
(note that these are not maintenance, but part of the development process); feature request from&lt;br /&gt;
specific application areas; application users will change apps to use them&lt;br /&gt;
* final software distributions to SourceForge (due month 47, 1 swe-person mos)&lt;/div&gt;</summary>
		<author><name>Sharon King</name></author>
	</entry>
	<entry>
		<id>http://vrl.cs.brown.edu/wiki/index.php?title=Action_Items_for_Sept._15th,_2009&amp;diff=3779</id>
		<title>Action Items for Sept. 15th, 2009</title>
		<link rel="alternate" type="text/html" href="http://vrl.cs.brown.edu/wiki/index.php?title=Action_Items_for_Sept._15th,_2009&amp;diff=3779"/>
		<updated>2009-09-18T15:38:39Z</updated>

		<summary type="html">&lt;p&gt;Sharon King: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;* Travel/visit planning (Sam) Put together a list of questions for the trip today. If Sam can&#039;t do it, then John can take a first pass at it by tomorrow (9/16). Need list before scheduling trip. Send blackout dates for travel to Sam through October 31.&lt;br /&gt;
* Timeline due today; integration by Tuesday (9/22) (John)&lt;br /&gt;
* Project management software initial setup by Tuesday, 9/22 (John/Sharon)&lt;br /&gt;
* G3D and VRG3D layer cake by Tuesday, 9/22 (Brad)&lt;br /&gt;
* Engines and Libraries - New Issue for wiki (John) by Tuesday, 9/22&lt;br /&gt;
* Cost sharing and ARRA reporting - (David) discuss with Jane&lt;br /&gt;
* FTE&#039;s and time commitment for people - PAFS: 5/5/5/10/25  asf/loomis/brad/sgf/john (Sharon/Jane)&lt;/div&gt;</summary>
		<author><name>Sharon King</name></author>
	</entry>
	<entry>
		<id>http://vrl.cs.brown.edu/wiki/index.php?title=Action_Items_for_Sept._15th,_2009&amp;diff=3778</id>
		<title>Action Items for Sept. 15th, 2009</title>
		<link rel="alternate" type="text/html" href="http://vrl.cs.brown.edu/wiki/index.php?title=Action_Items_for_Sept._15th,_2009&amp;diff=3778"/>
		<updated>2009-09-18T15:38:11Z</updated>

		<summary type="html">&lt;p&gt;Sharon King: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;* Travel/visit planning (Sam) Put together a list of questions for the trip today. If Sam can&#039;t do it, then John can take a first pass at it by tomorrow (9/16). Need list before scheduling trip. Send blackout dates for travel to Sam through October 31.&lt;br /&gt;
* Timeline due today; integration by Tuesday (9/22) (John)&lt;br /&gt;
* Project management software initial setup by Tuesday, 9/22 (John/Sharon)&lt;br /&gt;
* G3D and VRG3D layer cake by Tuesday, 9/22 (Brad)&lt;br /&gt;
* Engines and Libraries - New Issue for wiki (John) by Tuesday, 9/22&lt;br /&gt;
* Cost sharing and ARRA reporting - (David) discuss with Jane&lt;br /&gt;
* FTE&#039;s and time commitment for people - PAFS: 5/5/5/10/25  asf/loomis/brad/sgf/john (Sharon/Jane&lt;/div&gt;</summary>
		<author><name>Sharon King</name></author>
	</entry>
	<entry>
		<id>http://vrl.cs.brown.edu/wiki/index.php?title=Action_Items_for_Sept._15th,_2009&amp;diff=3777</id>
		<title>Action Items for Sept. 15th, 2009</title>
		<link rel="alternate" type="text/html" href="http://vrl.cs.brown.edu/wiki/index.php?title=Action_Items_for_Sept._15th,_2009&amp;diff=3777"/>
		<updated>2009-09-18T15:37:01Z</updated>

		<summary type="html">&lt;p&gt;Sharon King: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;* Travel/visit planning (Sam) Put together a list of questions for the trip today. If Sam can&#039;t do it, then John can take a first pass at it by tomorrow (9/16). Need list before scheduling trip. Send blackout dates for travel to Sam through October 31.&lt;br /&gt;
* Timeline due today; intergration by Tuesday (9/22) (John)&lt;br /&gt;
* Project management software initial setup by Tuesday, 9/22 (John/Sharon)&lt;br /&gt;
* G3D and VRG3D layer cake by Tuesday, 9/22 (Brad)&lt;br /&gt;
* Engines and Libraries - New Issue for wiki (John) by Tuesday, 9/22&lt;br /&gt;
* Cost sharing and ARRA reporting - (David) discuss with Jane&lt;br /&gt;
* FTE&#039;s and time commitment for people - PAFS: 5/5/5/10/25  asf/loomis/brad/sgf/john (Sharon/Jane&lt;/div&gt;</summary>
		<author><name>Sharon King</name></author>
	</entry>
	<entry>
		<id>http://vrl.cs.brown.edu/wiki/index.php?title=Action_Items_for_Sept._15th,_2009&amp;diff=3776</id>
		<title>Action Items for Sept. 15th, 2009</title>
		<link rel="alternate" type="text/html" href="http://vrl.cs.brown.edu/wiki/index.php?title=Action_Items_for_Sept._15th,_2009&amp;diff=3776"/>
		<updated>2009-09-18T15:32:17Z</updated>

		<summary type="html">&lt;p&gt;Sharon King: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;* Travel/visit planning (Sam) Put together a list of questions for the trip today. If Sam can&#039;t do it, then John can take a first pass at it by tomorrow (9/16). Need list before scheduling trip. Send blackout dates for travel to Sam through October 31.&lt;br /&gt;
* Timeline due today; intergration by Tuesday (9/22) (John)&lt;br /&gt;
*&lt;/div&gt;</summary>
		<author><name>Sharon King</name></author>
	</entry>
	<entry>
		<id>http://vrl.cs.brown.edu/wiki/index.php?title=Action_Items_for_Sept._15th,_2009&amp;diff=3775</id>
		<title>Action Items for Sept. 15th, 2009</title>
		<link rel="alternate" type="text/html" href="http://vrl.cs.brown.edu/wiki/index.php?title=Action_Items_for_Sept._15th,_2009&amp;diff=3775"/>
		<updated>2009-09-18T15:26:15Z</updated>

		<summary type="html">&lt;p&gt;Sharon King: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;* Travel/visit planning (Sam) Put together a list of questions for the trip today. If Sam can&#039;t do it, then John can take a first pass at it by tomorrow (9/16). Need list before scheduling trip. Send blackout dates to Sam through October 31.&lt;br /&gt;
* &lt;br /&gt;
*&lt;/div&gt;</summary>
		<author><name>Sharon King</name></author>
	</entry>
	<entry>
		<id>http://vrl.cs.brown.edu/wiki/index.php?title=Action_Items_for_Sept._15th,_2009&amp;diff=3774</id>
		<title>Action Items for Sept. 15th, 2009</title>
		<link rel="alternate" type="text/html" href="http://vrl.cs.brown.edu/wiki/index.php?title=Action_Items_for_Sept._15th,_2009&amp;diff=3774"/>
		<updated>2009-09-18T14:33:00Z</updated>

		<summary type="html">&lt;p&gt;Sharon King: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;* One&lt;br /&gt;
* two&lt;br /&gt;
** Three&lt;/div&gt;</summary>
		<author><name>Sharon King</name></author>
	</entry>
	<entry>
		<id>http://vrl.cs.brown.edu/wiki/index.php?title=Action_Items_for_Sept._15th,_2009&amp;diff=3773</id>
		<title>Action Items for Sept. 15th, 2009</title>
		<link rel="alternate" type="text/html" href="http://vrl.cs.brown.edu/wiki/index.php?title=Action_Items_for_Sept._15th,_2009&amp;diff=3773"/>
		<updated>2009-09-18T14:28:16Z</updated>

		<summary type="html">&lt;p&gt;Sharon King: /* Action Items for Sept. 15th, 2009 */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;* One&lt;br /&gt;
* two&lt;br /&gt;
* Three&lt;/div&gt;</summary>
		<author><name>Sharon King</name></author>
	</entry>
	<entry>
		<id>http://vrl.cs.brown.edu/wiki/index.php?title=Action_Items_for_Sept._15th,_2009&amp;diff=3772</id>
		<title>Action Items for Sept. 15th, 2009</title>
		<link rel="alternate" type="text/html" href="http://vrl.cs.brown.edu/wiki/index.php?title=Action_Items_for_Sept._15th,_2009&amp;diff=3772"/>
		<updated>2009-09-18T14:24:48Z</updated>

		<summary type="html">&lt;p&gt;Sharon King: New page: = Action Items for Sept. 15th, 2009 =  * One * two * Three&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;= Action Items for Sept. 15th, 2009 =&lt;br /&gt;
&lt;br /&gt;
* One&lt;br /&gt;
* two&lt;br /&gt;
* Three&lt;/div&gt;</summary>
		<author><name>Sharon King</name></author>
	</entry>
	<entry>
		<id>http://vrl.cs.brown.edu/wiki/index.php?title=New_CAVE_Design&amp;diff=3771</id>
		<title>New CAVE Design</title>
		<link rel="alternate" type="text/html" href="http://vrl.cs.brown.edu/wiki/index.php?title=New_CAVE_Design&amp;diff=3771"/>
		<updated>2009-09-18T14:23:08Z</updated>

		<summary type="html">&lt;p&gt;Sharon King: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=Hept-Cave Design Wiki=&lt;br /&gt;
&lt;br /&gt;
This page serves as a repository of the design issues, knowledge, and decisions for the new Brown Cave funded through an NSF grant from 2009-2013.&lt;br /&gt;
&lt;br /&gt;
== Weekly Cave action items ==&lt;br /&gt;
Below is a list of action items for each Cave design meeting.&lt;br /&gt;
* [[Action Items for Sept. 15th, 2009]]&lt;br /&gt;
&lt;br /&gt;
== Initial Design Issues ==&lt;br /&gt;
&lt;br /&gt;
=== Display Surface Angles === Assigned to DHL. Updates are due by 12:00 noon on 9/14.&lt;br /&gt;
&lt;br /&gt;
* Problem: What are the consequences of display surface angles and/or curvature (horizontal and vertical angles may be different)?&lt;br /&gt;
* Input needed&lt;br /&gt;
** Expert feedback from Acevedo re KAUST design choices&lt;br /&gt;
* Experiments needed&lt;br /&gt;
** Set up two side-by-side and top/bottom displays and evaluate anecdotally&lt;br /&gt;
* Decision: ?&lt;br /&gt;
&lt;br /&gt;
=== Blending/Butting at Display Boundaries === Assigned to SGF. Updates are due on 9/14 by 12:00 noon&lt;br /&gt;
&lt;br /&gt;
=== Text with Checkerboard Stereo === Assigned to JH. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
* Problem: What text resolution will be usable with checkerboard stereo and will that level be sufficient to do the experiments and applications that we want to do?&lt;br /&gt;
&lt;br /&gt;
=== Floor Design === Assigned to SGF. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
=== Treadmill Options === ( not Omni-directional) Assigned to SGF. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
=== Fixed wall design, or can it unfold into a powerwall? === Assigned to SGF.  Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
=== Ceiling Value, and Design Options === Assigned to SGF. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
=== Contracting to an Integrator === Assigned to SGF.  Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
* Problem: Would contracting to an integrator to build based on an RFP be effective?&lt;br /&gt;
* Input:&lt;br /&gt;
** Phone feedback from some of the potential integrators&lt;br /&gt;
* Decision:&lt;br /&gt;
&lt;br /&gt;
=== [[3D Tracking options]] === Assigned to JH. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
* Goals: wireless, accurate, low-latency, unobtrusive&lt;br /&gt;
* Examples: head-tracking, tracking fingers and body, tracking &amp;quot;phicons&amp;quot;/props&lt;br /&gt;
* Q: Is camera-based tracking reliable in a Cave?&lt;br /&gt;
&lt;br /&gt;
=== Hardware supporting usability studies === Assigned to ASF. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
* Problem: is special hardware needed to support evaluation of Cave-like systems (e.g., devices that measure galvanic skin response (GSR))?&lt;br /&gt;
* Input needed&lt;br /&gt;
** Advice from Mel Slater (How does Mel decide when GSR, etc. is important?  How expensive is the system?)&lt;br /&gt;
** Mel says, &amp;quot;[we use] a device called Nexus 4, which has skin conductance, ECG, respiration, and can also be used for EMG and EEG. I think that it is of the order of 10K or less depending on how many channels are used.&amp;quot;.&lt;br /&gt;
** Consider whether results from future (or past) studies would be significantly improved with such devices?&lt;br /&gt;
*** asf thoughts (may be wrong!): GSR helps detects changes in a person&#039;s &amp;quot;comfort&amp;quot;-- this might reflect the level of frustration or happiness while evaluating some user interaction or visualization method that the person doesn&#039;t verbalize; that may be useful additional information for formal studies.  PTSD studies would benefit from the information, I should think.  However, if the device requires stringing wires all around, it might cause subjects to behave differently which would be bad.&lt;br /&gt;
* Experiments needed&lt;br /&gt;
** none&lt;br /&gt;
* Decision: ?&lt;br /&gt;
&lt;br /&gt;
=== Commercial Software Availability === Assigned to JH. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
* Problem: What do we need to do to make sure that commercial software will be usable in our new facility?&lt;br /&gt;
* Input:&lt;br /&gt;
** Feedback from some of the software players (Avizo/Amira, Ensight, OpenSceneGraph)&lt;br /&gt;
* Decision:&lt;br /&gt;
&lt;br /&gt;
== Schedule, Timeline, and Deliverables == Assigned to SGF. Updates are due by 12:00 noon on Monday, 9/14.&lt;br /&gt;
&lt;br /&gt;
The following describes our schedule, timeline, and&lt;br /&gt;
deliverables using absolute months into the project (months 0-11 is year 1, months 12-23 is year 2, etc.).&lt;br /&gt;
&lt;br /&gt;
== Year 1 (0.50 hw-person FTE +consulting) ==&lt;br /&gt;
&lt;br /&gt;
We will finalize hardware decisions which will&lt;br /&gt;
involve evaluating changes in availability since proposal submission; demonstrations of competing manufacturer’s&lt;br /&gt;
equipment; consultation regarding details of acquiring, machining, and integrating elements; and&lt;br /&gt;
ordering the central display equipment (projectors, screen material, computers, trackers). The new equipment&lt;br /&gt;
will be received late in the year. Through a process that minimizes system downtime, the 1998 Cave&lt;br /&gt;
will be taken down and removed.&lt;br /&gt;
&lt;br /&gt;
* Acquire test projection system(s) (month 1)&lt;br /&gt;
* Acquire test graphics system(s) (month 1)&lt;br /&gt;
* Acquire test tracking system(s) (month 1)&lt;br /&gt;
* multi-site visit, design discussions, consultent visits (month 1 - month 3)&lt;br /&gt;
* finalize refined design (due month 3, 1.5 hw-person mos)&lt;br /&gt;
* order additional wall/test equipment (month 2)&lt;br /&gt;
* Begin build on test tiled display wall (month 3 - month 6, 1.0 hw-person mo)&lt;br /&gt;
* order Cave equipment (due month 5, 1.0 hw-person mos) screens; projectors;computer parts, racks; computer interconnect; computer-display connections; display-display interconnections; display calibration hardware/software; tracking hardware.&lt;br /&gt;
* receive equipment (due month 8, 0.5 hw-person mos)&lt;br /&gt;
* computer cluster assembled (due month 11, 1 hw-person mo) machine/construct/assemble computer supports; assemble computer hw with high-speed interconnect; install and test OS on cluster&lt;br /&gt;
* raised floor and other site preparations complete (due month 11, 1.0 hw-person mo)&lt;br /&gt;
* Install replacement tile wall, temporary system (month 11)&lt;br /&gt;
* remove 1998 Cave (due at least disruptive time in year 1 TBD, 0.5 hw-person mo)&lt;br /&gt;
&lt;br /&gt;
== Year 2: (0.67 hw-person FTE, 0.58 swe-person FTE)==&lt;br /&gt;
In year 2 we will complete construction of the&lt;br /&gt;
display, bring computer systems online, install TGS’s Avizo and our own VRG3D software, and begin&lt;br /&gt;
testing individual and linked systems.&lt;br /&gt;
* display hardware (due month 20, 4.5 hw-person mos, +machining/fab), (will start in year 1) detailed screen support specifications; detailed monitor support specifications; machine and construct screen supports; machine and construct projector platforms; mount screens and projectors; rough-calibrate projectors&lt;br /&gt;
* display-computer interconnect (due month 20, 0.5 hw-person mo)&lt;br /&gt;
* tracker system(s) (due month 20, 2-4 hw-person mos) install and test; calibrate; create hooks for monitoring and testing&lt;br /&gt;
* VRG3D display software library (due month 23, 6 swe-person mos) source-control setup; ability to distribute software configurable for arbitrary multi-display devices; implemented for new display configuration; multi-display optimizations incorporated; tracking incorporated; hooks for automated testing incorporated&lt;br /&gt;
* install Avizo (due month 23, 1 swe-person mos)&lt;br /&gt;
== Year 3 (0.63 hw-person FTE, 0.63 swe-person FTE) ==&lt;br /&gt;
Monitoring and testing reliability software will be&lt;br /&gt;
designed, developed, and deployed. Application users and developers will be able to begin using the system.&lt;br /&gt;
* VRG3D-based example application (due month 26, 2 swe-person mos) identify additional problems with library&lt;br /&gt;
* distribution version of VRG3D available (due month 30, 1 swe-person mos)&lt;br /&gt;
* application users can now begin creating new applications&lt;br /&gt;
* monitoring/testing reliability software (due month 30, 2 hw-person mos, 4.5 swe-person mos) daily builds of software library and application; daily tests of machine accessibility (tracking, compute cluster functionality/performance, display device availability); touchscreen display of component status/availability; touchscreen access to troubleshooting options; easily extensible touchscreen interface for startup of (experiments, applications, demos, homework assignments) item displayfacet alignment system (due month 35, 5.5 hw-person mos)&lt;br /&gt;
&lt;br /&gt;
== Year 4 (0.17 hw-person FTE, 0.33 swe-person FTE) == &lt;br /&gt;
In year 4 we will finalize the software infrastructure,&lt;br /&gt;
complete the auto-calibration system.&lt;br /&gt;
* software library changes (due month 36, 2 hw-person mos, 3 swe-person mos)&lt;br /&gt;
(note that these are not maintenance, but part of the development process); feature request from&lt;br /&gt;
specific application areas; application users will change apps to use them&lt;br /&gt;
* final software distributions to SourceForge (due month 47, 1 swe-person mos)&lt;/div&gt;</summary>
		<author><name>Sharon King</name></author>
	</entry>
</feed>